Hoop Prestressing Technique on Pylons of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway

被引:0
|
作者
Wang, Nian [1 ]
机构
[1] The 4th Engineering Co., Ltd., China Railway Major Bridge Engineering Group, Nanjing,210031, China
来源
Bridge Construction | 2019年 / 49卷 / 04期
关键词
Cable stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway is a box and truss composite girder cable-stayed bridge with a main span of 588 m which consists of double pylons and double cable planes. The parallel steel cables are adopted and the maximum tension of a single cable is 16 000 kN. The combination of an anchorage system of steel anchor beam cable and an anchorage system of prestressed parallel wire ring is adopted in the cable anchorage zone, and the #-shaped prestressed anchorage is adopted in the single-layer prestressed system. Prestressed wire bundles with 36φ7 mm high strength and low relaxation, of which the tensile strength is 1 670 MPa and the modulus of elasticity is 2.05×105 MPa, are adopted for prestressing. During the construction of the bridge pylons, a metal corrugated pipe with an inner diameter of 90 mm is pre-embedded to serve as a channel for prestressing. Wire bundles should be braided in advance, and tension end heading should be upset in advance, so that wire bundles are pierced after tower column template is removed. After the steel wire is pierced, the fixed end anchor plate is installed and the fixed end is cut, and then the fixed end heading is upset. After the strength of concrete for pylon column meets the requirements of specifications, tension is prestreesed by a 250 t piercing hydraulic jack, thereafter, the prestressed hole grouting is carried out, and finally the prestressed anchor mouth is closed to complete the prestressing construction. © 2019, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:7 / 12
相关论文
共 50 条
  • [31] Construction monitoring and control of steel truss girder cable-stayed bridge of Huanggang Changjiang River Rail-cum-Road bridge
    Li, Wei-Hua
    Yang, Guang-Wu
    Yue, Qing
    Wu, Guo-Qiang
    Bridge Construction, 2013, 43 (03) : 11 - 17
  • [32] Construction Techniques for Auxiliary Arch Bridge of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Shen, Xuan
    Dai, Hao
    Bridge Construction, 2022, 52 (03) : 133 - 139
  • [33] Key Design Techniques of Main Bridge of Jiyang Huanghe River Rail-cum-Road Bridge
    Sun, Zonglei
    Feng, Yacheng
    Zhang, Xiaokun
    Bridge Construction, 2024, 54 (04) : 119 - 125
  • [34] Manufacturing techniques for all-welded truss units of steel girder of Tongling Changjiang River Rail-cum-Road Bridge
    Yan, Huai-Bin
    Zheng, Zi-Yuan
    Huang, Xing-Yu
    Bridge Construction, 2014, 44 (01) : 6 - 10
  • [35] Construction techniques for long span roadway steel box girders of rail-cum-road section of Tongling Changjiang River Bridge
    China Railway Major Bridge Engineering Group Co., Ltd., Wuhan 430050, China
    Bridge Constr., 2 (96-100):
  • [36] Superstructure Closing Schemes for Tongling Changjiang River Rail-cum-Road Bridge Carrying a Section of G3 Expressway
    Xie, Lanbo
    Qiu, Feng
    Huang, Yong
    Bridge Construction, 2023, 53 : 163 - 168
  • [37] Key Construction Techniques of Extra Wide Steel Box Girders in Main Bridge of Lingang Changjiang River Rail-cum-Road Bridge in Yibin
    Yang R.
    Chen Z.
    Yu Z.
    Chen B.
    Hua S.
    Bridge Construction, 2024, 54 (01) : 16 - 22
  • [38] REPLACEMENT OF THE FLOORING OF RAIL-CUM-ROAD BRIDGE OVER RIVER BEAS ON JALANDHAR PATHANKOT SECTION OF NORTHERN RAILWAY.
    Sablok, Deepak
    Singh, Viram
    Chopra, Rakesh
    Indian highways, 1988, 16 (06): : 17 - 28
  • [39] River Traffic Organization Schemes for Girder Construction of Main Navigational Channel Bridge of Shanghai-Suzhou-Nantong Changjiang River Rail-cum-Road Bridge
    Li, Rui-Bin
    Sun, Yong-Qiang
    Liu, Jia
    An, Yi-Ming
    Bridge Construction, 2020, 50 (04) : 112 - 117
  • [40] Study on Stay Cables Composed of 2 100 MPa Steel Strands and Anchorages of Maanshan Changjiang River Rail-cum-Road Bridge
    Zhang Q.
    Li B.
    Hao Y.
    Zhou Q.
    Bridge Construction, 2024, 54 (01) : 1 - 7