Hoop Prestressing Technique on Pylons of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway

被引:0
|
作者
Wang, Nian [1 ]
机构
[1] The 4th Engineering Co., Ltd., China Railway Major Bridge Engineering Group, Nanjing,210031, China
来源
Bridge Construction | 2019年 / 49卷 / 04期
关键词
Cable stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway is a box and truss composite girder cable-stayed bridge with a main span of 588 m which consists of double pylons and double cable planes. The parallel steel cables are adopted and the maximum tension of a single cable is 16 000 kN. The combination of an anchorage system of steel anchor beam cable and an anchorage system of prestressed parallel wire ring is adopted in the cable anchorage zone, and the #-shaped prestressed anchorage is adopted in the single-layer prestressed system. Prestressed wire bundles with 36φ7 mm high strength and low relaxation, of which the tensile strength is 1 670 MPa and the modulus of elasticity is 2.05×105 MPa, are adopted for prestressing. During the construction of the bridge pylons, a metal corrugated pipe with an inner diameter of 90 mm is pre-embedded to serve as a channel for prestressing. Wire bundles should be braided in advance, and tension end heading should be upset in advance, so that wire bundles are pierced after tower column template is removed. After the steel wire is pierced, the fixed end anchor plate is installed and the fixed end is cut, and then the fixed end heading is upset. After the strength of concrete for pylon column meets the requirements of specifications, tension is prestreesed by a 250 t piercing hydraulic jack, thereafter, the prestressed hole grouting is carried out, and finally the prestressed anchor mouth is closed to complete the prestressing construction. © 2019, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:7 / 12
相关论文
共 50 条
  • [1] Key Techniques for Construction of Pylons of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Wang, Ling-Xia
    Liu, Ai-Lin
    Bridge Construction, 2019, 49 (04): : 1 - 6
  • [2] Design of Steel Girder for the Main Bridge of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Zou, Min-Yong
    Yi, Lun-Xiong
    Wu, Guo-Qiang
    Bridge Construction, 2019, 49 (01) : 65 - 70
  • [3] Installation Control Techniques for Stay Cables of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Zhao, Cheng-Gui
    Bridge Construction, 2020, 50 (04) : 107 - 111
  • [4] Key Erection Techniques for Main Bridge Steel Girder of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Liu, Ai-Lin
    Li, Xu
    Bridge Construction, 2020, 50 (01) : 1 - 6
  • [5] Key Construction Techniques for Upper Pylon Cross Beams of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Zhou, Qian-Zhong
    Wang, Ling-Xia
    Bridge Construction, 2020, 50 (03) : 11 - 16
  • [6] Construction Techniques for Highway Steel Box Girders of North Approach Bridge of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Liu, Ai-Lin
    Li, Xu
    Ren, Yin-Liang
    Bridge Construction, 2019, 49 (06) : 114 - 119
  • [7] Positioning and Measuring Techniques for Steel Anchor Beams in Pylon at Pier No.2 of Wuhu Changjiang River Rail-cum- Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Cui, Wei
    Fu, Xin-Jun
    Chen, Xiang
    Zhi, Chao
    Bridge Construction, 2020, 50 (02) : 110 - 115
  • [8] Design of Pylons of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Chen, Zhitao
    Huang, Xijun
    Liu, Hanshun
    Yang, Xueqi
    Bridge Construction, 2024, 54 (03) : 1 - 7
  • [9] Construction techniques for upper cross beams of pylons of Huanggang Changjiang River Rail-cum-Road bridge
    Zhang, D.-Z. (357723363@qq.com), 1600, Wuhan Bridge Research Institute (43):
  • [10] Experimental Research on Wind-Resistant Performance of Main Bridge of Wuhu Changjiang River Rail-cum-Road Bridge
    He, Xu-Hui
    Zhang, Bing
    Zou, Yun-Feng
    Yi, Lun-Xiong
    Cai, Chang
    Bridge Construction, 2019, 49 (02): : 24 - 29