An evolutionary game approach for private sectors’ behavioral strategies in China's green energy public–private partnership projects

被引:2
|
作者
Liu, Jicheng [1 ]
Yu, Jing [1 ]
Yin, Yu [1 ]
Wei, Qiushuang [2 ]
机构
[1] School of Economics and Management, North China Electric Power University, Hui Long Guan, Chang Ping District, Beijing,102206, China
[2] Guangxi Normal Univ, Sch Polit & Publ Adm, Guilin,541004, China
来源
Energy Reports | 2021年 / 7卷
基金
中国国家自然科学基金;
关键词
Game theory - Decision making - Energy policy - Mergers and acquisitions - Economic and social effects;
D O I
暂无
中图分类号
学科分类号
摘要
To improve sustainable energy utilization and production, the green energy public–private partnership (PPP) projects are supported by the government which encourages green power generation and selling, and attract the private sectors’ attention. To ensure the project success, analyzing the willingness of the private sectors participating in the project and investigating their behavioral strategies become crucial and necessary. This paper uses the evolutionary game theory to explore the behavioral strategies of private sectors from the perspectives of green energy generators and sellers, considering multiple influencing factors during green energy production in a PPP project. An evolutionary game model to investigate the relationship between stakeholders is established. The evolutionary stable strategy (ESS) are calculated and influencing parameters are discussed. A numerical simulation is performed to quantify private sectors’ relationship and behavioral strategies. The results indicate that private sectors’ cooperation strategies are affected by basis payoffs, social and environmental benefits, subsidies, cooperative incentives, transaction costs and the government punishment, and their strategies can be changed by controlling the initial cooperative probabilities and parameters. This work provides a decision-making approach for private sectors to determine the appropriate cooperation strategies when participating in a green energy PPP project. © 2021 The Author(s)
引用
下载
收藏
页码:696 / 715
相关论文
共 50 条
  • [21] Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China
    Ke, Yongjian
    Hao, Weiya
    Ding, Huiping
    Wang, Yingying
    CONSTRUCTION ECONOMICS AND BUILDING, 2017, 17 (01): : 90 - 106
  • [22] Evolutionary Game Analysis of Government and Enterprise Behavior Strategies in Public-Private-Partnership Farmland Consolidation
    Wang, Wenxiong
    Song, Ziying
    Zhou, Wei
    Jiang, Yong
    Sun, Yuan
    AGRICULTURE-BASEL, 2022, 12 (11):
  • [23] Risk assessment of sewage treatment Public Private Partnership projects in China
    Zhao, Hui
    Zhang, Jingqi
    Li, Zhijie
    DESALINATION AND WATER TREATMENT, 2022, 249 : 119 - 134
  • [24] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE Transactions on Engineering Management, 2020, 67 (02): : 376 - 384
  • [25] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2020, 67 (02) : 376 - 384
  • [26] Spatio-temporal dynamics of public private partnership projects in China
    Cheng, Zhe
    Ke, Yongjian
    Lin, Jing
    Yang, Zhenshan
    Cai, Jianming
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) : 1242 - 1251
  • [27] Priority Model for Public-Private Partnership Investment in Energy Projects
    Elwakil, Emad
    Hegab, Mohamed
    2018 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2018, : 173 - 177
  • [28] A systematic approach for public-private partnership projects CSFs evaluation
    Wang, Liping
    Zhang, Pu
    Zhang, Pei
    Li, Rongbo
    Zhang, Yanke
    Wu, Yueqiu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (09) : 1127 - 1145
  • [29] Public private partnership approach in electrical projects - How to make a decision
    Bdelkhalek, Hesham A.
    Abullah, Ibrahim
    Almershid, Abdullah
    AEJ - Alexandria Engineering Journal, 2008, 47 (02): : 201 - 210
  • [30] The behavioral strategies of multiple stakeholders in the NIMBY facility public-private partnership project: a tripartite evolutionary game analysis based on prospect theory
    Cheng, Xiaotong
    Cheng, Min
    Liu, Yaqun
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2024, 51 (10) : 1126 - 1144