共 50 条
- [44] SCHEDULING GENERATION ON SYSTEMS WITH FOSSIL AND NUCLEAR UNITS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1970, 13 (02): : 768 - &
- [45] A Variable Scheduling Maintenance Culture Platform for Mammalian Cells SLAS TECHNOLOGY, 2021, 26 (02): : 209 - 217
- [47] Optimal resource allocation and scheduling for the CELL BE platform Annals of Operations Research, 2011, 184 : 51 - 77
- [48] An accelerated MIP model for the single machine scheduling with preventive maintenance IFAC PAPERSONLINE, 2016, 49 (12): : 1945 - 1949
- [49] Using Accelerated Life Testing Techniques for Preventive Maintenance Scheduling 2014 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2014,
- [50] Learning to branch in the generation maintenance scheduling problem GLOBAL ENERGY INTERCONNECTION-CHINA, 2022, 5 (04): : 409 - 417