Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing

被引:0
|
作者
Ab. Rashid, Mohd Fadzil Faisae [1 ]
Mohd Rose, Ahmad Nasser [1 ]
Nik Mohamed, Nik Mohd Zuki [1 ]
Mohd Romlay, Fadhlur Rahman [1 ]
机构
[1] Faculty of Mechanical Engineering, Universiti Malaysia Pahang, Pekan, Malaysia
来源
关键词
Ant colony optimization - Wages - Particle swarm optimization (PSO) - Assembly machines - Benchmarking - Manufacture - Assembly - Costs;
D O I
暂无
中图分类号
学科分类号
摘要
Purpose: This paper aims to propose an improved Moth Flame Optimization (I-MFO) algorithm to optimize the cost-oriented two-sided assembly line balancing (2S-ALB). Prior to the decision to assemble a new product, the manufacturer will carefully study and optimize the related cost to set up and run the assembly line. For the first time in ALB, the power cost is modeled together with the equipment, set up and labor costs. Design/methodology/approach: I-MFO was proposed by introducing a global reference flame mechanism to guide the global search direction. A set of benchmark problems was used to test the I-MFO performance. Apart from the benchmark problems, a case study from a body shop assembly was also presented. Findings: The computational experiment indicated that the I-MFO obtained promising results compared to comparison algorithms, which included the particle swarm optimization, Cuckoo Search and ant colony optimization. Meanwhile, the results from the case study showed that the proposed cost-oriented 2S-ALB model was able to assist the manufacturer in making better decisions for different planning periods. Originality/value: The main contribution of this work is the global reference flame mechanism for MFO algorithm. Furthermore, this research introduced a new cost-oriented model that considered power consumption in the assembly line design. © 2019, Emerald Publishing Limited.
引用
收藏
页码:638 / 663
相关论文
共 50 条
  • [41] An improved artificial bee colony algorithm with MaxTF heuristic rule for two-sided assembly line balancing problem
    Xiaokun Duan
    Bo Wu
    Youmin Hu
    Jie Liu
    Jing Xiong
    Frontiers of Mechanical Engineering, 2019, 14 : 241 - 253
  • [42] Improved discrete artificial bee colony algorithm for type I two-sided assembly line balancing problem
    Li Z.
    Tang Q.
    Zhang L.
    Zheng P.
    Tang, Qiuhua (tangqiuhua@wust.edu.cn), 1600, CIMS (22): : 974 - 982
  • [43] Co-evolutionary particle swarm optimization algorithm for two-sided robotic assembly line balancing problem
    Li, Zixiang
    Janardhanan, Mukund Nilakantan
    Tang, Qiuhua
    Nielsen, Peter
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (09) : 1 - 14
  • [44] Heuristic Algorithm for Two-sided Assembly Line Balancing Problem with Multi-objectives
    Hu, Xiaofeng
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1407 - 1410
  • [45] Two-sided With Multi-parallel Stations Assembly Line Balancing Problem and Algorithm
    Yuan, Pengyu
    Xu, Qian
    Song, Huaming
    2015 8TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 1, 2015, : 602 - 605
  • [46] Meta-heuristic algorithm to solve two-sided assembly line balancing problems
    Wirawan, A. D.
    Maruf, A.
    2ND INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE AND 3RD ASIA-PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS (IMEC-APCOMS 2015), 2016, 114
  • [47] A harmony search based algorithm for a stochastic two-sided assembly line balancing problem
    Wu, Jiaxi
    Jiang, Wei
    Shi, Leyuan
    2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, : 606 - 611
  • [48] Line balancing of two-sided assembly cell in lean manufacturing
    Abu Bakar, Kamarudin
    Musa, Anis Masyitah
    PROCEEDINGS OF MECHANICAL ENGINEERING RESEARCH DAY 2019 (MERD'19), 2019, : 227 - 229
  • [49] A Heuristic Method for Two-sided Assembly Line Balancing Problem
    秦杏敏
    金烨
    Journal of Shanghai Jiaotong University, 2005, (01) : 61 - 65
  • [50] A multiple rule-based genetic algorithm for cost-oriented stochastic assembly line balancing problem
    Foroughi, Ahad
    Gokcen, Hadi
    ASSEMBLY AUTOMATION, 2019, 39 (01) : 124 - 139