共 50 条
- [1] Channel degradation in the Yangtze River after the impoundment of the Three Gorges Project [J]. SEDIMENT PROBLEMS AND SEDIMENT MANAGEMENT IN ASIAN RIVER BASINS, 2011, 349 : 154 - 162
- [4] Scouring effect of the middle and lower reaches of the Yangtze River and its impact after the impoundment of the Three Gorges Project [J]. Hupo Kexue/Journal of Lake Sciences, 2023, 35 (02): : 650 - 661
- [6] Longitudinal variation of channel evolution along the middle Yangtze River after the operation of the Three Gorges Project [J]. Hupo Kexue/Journal of Lake Sciences, 2023, 35 (02): : 642 - 649
- [7] Quantifying the spatio-temporal variation of flow and sediment in the middle Yangtze River after the impoundment of the Three Gorges [J]. Shuikexue Jinzhan/Advances in Water Science, 2014, 25 (05): : 650 - 657
- [8] Analysis of equilibrium sediment transport in the middle and lower reaches of the Yangtze River after the impoundment of the Three Gorges Reservoir [J]. Hupo Kexue/Journal of Lake Sciences, 2021, 33 (03): : 806 - 818
- [9] Study on the influence of the Three Gorges Project on the middle and lower Yangtze River [J]. RIVER SEDIMENTATION: THEORY AND APPLICATIONS, 1999, : 421 - 425
- [10] Impacts of the Three Gorges Project on flood in the middle reach of Yangtze River [J]. RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 2229 - +