Study on Construction Scheme of High-speed Maglev Railway Test Line

被引:0
|
作者
Mu, Hanlin [1 ]
Zhang, Yimin [2 ]
Xu, Xubao [1 ]
Yu, Zhuangzhuang [1 ]
机构
[1] State Key Laboratory of Rail Transit Vehicle System, Southwest Jiaotong University, Sichuan, Chengdu,610031, China
[2] China Railway Siyuan Survey and Design Group Co. Ltd, Hubei, Wuhan,430063, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
8
引用
收藏
页码:44 / 49
相关论文
共 50 条
  • [31] Wind Tunnel Test of Wind Load on a Typical Cross Line High-Speed Railway Station
    Lei Zhao
    Zhixiang Yu
    Xin Qi
    Hu Xu
    KSCE Journal of Civil Engineering, 2021, 25 : 3779 - 3787
  • [32] Research on Intelligent Decision-making Method of Investment Scheme of High-speed Railway Construction Project
    Duan X.
    Hao J.
    Niu Y.
    IEIE Transactions on Smart Processing and Computing, 2023, 12 (06): : 483 - 494
  • [33] CHINA HIGH-SPEED RAILWAY BRIDGE CONSTRUCTION KEY TECHNOLOGIES
    Lei, Junqing
    Zhang, Kun
    Guo, Dongchen
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 699 - 704
  • [34] Information-Based Construction of High-Speed Railway Tunnel
    Yang, Qian
    Wang, Zhaoling
    SHOCK AND VIBRATION, 2017, 2017
  • [35] Development of design and construction of high-speed railway bridges in Germany
    Kang, Chongjie
    Schneider, Sebastian
    Wenner, Marc
    Marx, Steffen
    ENGINEERING STRUCTURES, 2018, 163 : 184 - 196
  • [36] The Global High-Speed Railway Construction and Its Geopolitical Implications
    Lin Limin
    Hong Jianjun
    Contemporary International Relations, 2014, 24 (04) : 85 - 102
  • [37] Impact of high-speed railway construction on spatial patterns of regional economic development along the route: A case study of the Shanghai-Kunming high-speed railway
    Wang, Chao
    Chen, Junjing
    Li, Boyan
    Chen, Nengcheng
    Wang, Wei
    SOCIO-ECONOMIC PLANNING SCIENCES, 2023, 87
  • [38] A Study on a LTE-Based Channel Sounding Scheme for High-Speed Railway Scenarios
    Zhou, Tao
    Tao, Cheng
    Liu, Liu
    Tan, Zhenhui
    2013 IEEE 78TH VEHICULAR TECHNOLOGY CONFERENCE (VTC FALL), 2013,
  • [39] Study on the construction cost scheme of separation of transportation and erection of 40 m simply supported box girder on high-speed railway
    Huang, Yugang
    Huang, Yugang (ygh_gjc@sina.com), 2013, Central South University Press (18): : 2013 - 2020
  • [40] Cyclic Timetable Scheduling Problem on High-speed Railway Line
    Xu W.
    Tan Y.
    Sharma B.
    Wang Z.
    Periodica Polytechnica Transportation Engineering, 2019, 48 (01): : 31 - 38