Optimal selection and location of tower crane for the construction of prefabricated buildings with different prefabrication ratios

被引:0
|
作者
Huang C. [1 ]
Li R. [2 ]
Fu Y. [2 ]
Ireland V. [3 ]
机构
[1] Faculty of transportation and municipal engineering, Chongqing Jianzhu College, Chongqing
[2] School of Management Science and Real Estate, Chongqing University, Chongqing
[3] Faculty of Engineering, Computer and Mathematical Sciences, The University of Adelaide, Adelaide, 5005, SA
来源
Journal of Engineering Science and Technology Review | 2019年 / 12卷 / 06期
关键词
Location of tower crane; Prefabricated building; Prefabrication ratio; Selection of tower crane; Tower crane;
D O I
10.25103/jestr.126.22
中图分类号
学科分类号
摘要
Tower cranes had been used extensively with the new upsurge of prefabricated buildings in China. Construction time and cost could be affected by the prefabrication ratio of prefabricated buildings, the selection and location of tower cranes. This study proposed a cost-based selection and location optimization model for tower crane to reveal the relationship between the prefabrication ratio and the optimal selection and location of tower crane. Moreover, this study further discussed different prefabrication ratios. The range of the tower crane type was preliminarily determined on the basis of its performance parameters and the construction project scope. The location scope of the tower crane was determined by investigating the positional relationship among tower crane and supply and demand points. Then, the optimal selection and location of the tower crane were obtained with the lowest cost. Three typical construction cases were discussed under different prefabrication ratios by taking a ten-story prefabricated building in Chongqing as an example. Results demonstrate that when the required prefabrication ratio is not less than 30%, selecting prefabricated beam is the most economical for the construction project. When the number reaches 50%, the combination of prefabricated columns and beams is the most economical. The lowest cost of the tower crane is obtained when the supply point is located at the midpoint of the long side in the construction project. The proposed method provides reference for the selection of prefabricated components and the selection and location of tower crane of prefabricated buildings. © 2019 School of Science, IHU.
引用
收藏
页码:173 / 181
页数:8
相关论文
共 22 条
  • [1] A SCO-Based Tower Crane System for Prefabrication Construction
    Liu, Diandian
    Lu, Weisheng
    Niu, Yuhan
    Wang, Hongdi
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 981 - 991
  • [2] Dispatching rule design for tower crane scheduling in prefabricated construction via genetic programming
    Yin, Jing
    Wang, Huanhuan
    Li, Jiahao
    Zhang, Zhitian
    Cai, Shunyao
    Liu, Wenjun
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [3] Optimal Location for Tower Crane and Dynamic Trailer Parking in High-Rise Modular Building Construction Project
    Malaikrisanachalee, Suphawut
    Wongwai, Narongrit
    Butsan, Nujet
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2024, 9 (05) : 965 - 987
  • [4] Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization
    Chen, Ying
    Okudan, Guel E.
    Riley, David R.
    AUTOMATION IN CONSTRUCTION, 2010, 19 (06) : 665 - 675
  • [5] GA optimization model for solving tower crane location problem in construction sites
    Abdelmegid, Mohammed Adel
    Shawki, Khaled Mohamed
    Abdel-Khalek, Hesham
    ALEXANDRIA ENGINEERING JOURNAL, 2015, 54 (03) : 519 - 526
  • [6] Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location
    Hebiba, AlaaEldin Magdy
    Bouferguene, Ahmed
    Moon, Sungkon
    Han, SangHyeok
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (11)
  • [7] System Hazard Analysis of Tower Crane in Different Phases on Construction Site
    Jiang, Ling
    Zhao, Tingsheng
    Zhang, Wei
    Hu, Junjie
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [8] Dynamical modelling of boom tower crane rigging systems: model selection for construction
    Johns, Brandon
    Abdi, Elahe
    Arashpour, Mehrdad
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2023, 23 (03)
  • [9] Working time optimal planning of construction site served by a single tower crane
    Allan Tubaileh
    Journal of Mechanical Science and Technology, 2016, 30 : 2793 - 2804
  • [10] Working time optimal planning of construction site served by a single tower crane
    Tubaileh, Allan
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2016, 30 (06) : 2793 - 2804