Optimal Location for Tower Crane and Dynamic Trailer Parking in High-Rise Modular Building Construction Project

被引:0
|
作者
Malaikrisanachalee, Suphawut [1 ]
Wongwai, Narongrit [2 ]
Butsan, Nujet [3 ]
机构
[1] Kasetsart Univ, Dept Civil Engn, Bangkok 10900, Thailand
[2] Kasetsart Univ, Dept Civil Engn, Sriracha Campus, Sriracha 20230, Thailand
[3] Kasetsart Univ, Dept Civil Engn Infrastruct Engn & Management, Bangkok 20230, Thailand
关键词
Tower crane position analysis; Precast building; Dynamic trailer parking; Genetic algorithm; Optimal solution; OPTIMIZATION;
D O I
10.33889/IJMEMS.2024.9.5.051
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Optimization of tower crane positioning is essential in precast building construction to ensure that a crane is in the right position to offer the best value for placing precast elements. The first goal is the optimization of transportation distances made by tower cranes, which will address the issues of efficiency and cost. This is done in a way that provides for minimization of the distances that lie between the trailer parking where elements are parked, the tower crane, and the construction installation point. However, current research fails to address the dynamic movement efficiency of trailers, especially when handling multiple trailers and several models of tower cranes, making this scenario an optimization problem that is classified as NP-hard due to the likelihood of causing a combinatorial explosion. This work endeavors to present a new mathematical model that has been applied to the Genetic Algorithm (GA). The ideal demand-generated model is designed to solve the optimal model and position of tower cranes and the prospective positioning of trailers for parking. The feasibility and applicability of the method exploited in the study are also established through a project case study. When adopting the proposed planning model compared to the earlier planning scale, comparisons highlight a small yet significant saving of 6% in time and cost when lifting elements instead of providing them from the trailers by setting up a new on-site stockyard. In addition, a great deal of enhancement is also observed in the final solution aspects, where the developed GA has even reduced the operational time and cost by half a percent each. The results of this research offer best-practice approaches to the position analysis of tower cranes in precast building construction to bring scalability and cost optimization to bear on the construction business.
引用
收藏
页码:965 / 987
页数:23
相关论文
共 50 条
  • [1] Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
    Hyun, Hosang
    Park, Moonseo
    Lee, Dowan
    Lee, Jeonghoon
    BUILDINGS, 2021, 11 (03)
  • [2] Effects of a Construction Tower Crane on the Wind Loading of a High-Rise Building
    Mara, T. G.
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2010, 136 (11): : 1453 - 1460
  • [3] Critical considerations on tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    Pan, Mi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2615 - 2634
  • [4] Construction of high-rise building with underground parking in Moscow
    Ilyichev, Vyacheslav
    Nikiforova, Nadezhda
    Konnov, Artem
    E3S Web of Conferences, 2018, 33
  • [5] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 130
  • [6] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    Automation in Construction, 2021, 130
  • [7] Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 127
  • [8] Location Optimization of Tower Cranes on High-Rise Modular Housing Projects
    Zhou, Cong
    Dai, Fu
    Xiao, Zerui
    Liu, Wei
    BUILDINGS, 2023, 13 (01)
  • [9] Automatic tower crane layout planning system for high-rise building construction using generative adversarial network
    Li, Rongyan
    Chi, Hung-Lin
    Peng, Zhenyu
    Li, Xiao
    Chan, Albert P. C.
    ADVANCED ENGINEERING INFORMATICS, 2023, 58
  • [10] Building high-rise modular homes
    Capita Symonds, United Kingdom
    Struct Eng, 2007, 1 (20-21):