Two-stage Scheduling for Island CPHH IES Considering Plateau Climate

被引:3
|
作者
Pu, Yuchen [1 ]
Li, Qi [1 ]
Qiu, Yibin [1 ]
Zou, Xueli [1 ]
Chen, Weirong [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Elect Engn, Chengdu 611756, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Heating systems; Fuel cells; Hydrogen; Optimal scheduling; Resistance heating; Cogeneration; Real-time systems; CPHH; feul cell; hydrogen; island IES; scheduling; ENERGY MANAGEMENT; POWER; MODEL; HEAT; HYDROGEN; MICROGRIDS; PREDICTION; NETWORKS; RECOVERY; CHP;
D O I
10.17775/CSEEJPES.2020.05090
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this paper, an island integrated energy system (IES) combining power, heat and hydrogen (CPHH) is built, and optimal power-heat-hydrogen scheduling is studied under actual plateau meteorological data. Considering the comprehensive demands of residents, an IES including renewable energy sources (RESs), fuel cell, electrolyzer, electric boiler, thermal energy storage device and new energy vehicles is established and operated. In the first stage of operation, according to the prediction of RESs and demands, day-ahead optimization is carried out which aims to minimize operation cost, while electric vehicles (EVs) are considered as special demand response (DR) loads. For the second stage of operation, ultra-short-term prediction is implemented to provide prediction data for model predictive control (MPC), realizing real-time operation. Functioning as a CPHH system, the fuel cell and electrolyzer collaborate to meet various needs of the plateau residential area with high efficiency. In addition, the method and IES structure proposed in this paper is compared with other options.
引用
收藏
页码:1775 / 1786
页数:12
相关论文
共 50 条
  • [21] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [22] Two-Stage Uncertain Optimal Scheduling of Active Distribution Network Considering Operational Risk
    Dong, Lei
    Zhao, Can
    Chen, Naishi
    Li, Ye
    Pu, Tianjiao
    2016 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2016, : 1699 - 1703
  • [23] Two-stage planning-operation co-optimization of IES considering uncertainty and electrical/thermal energy storage
    Lei J.
    Guo Z.
    Chen C.
    Yuan Z.
    Ma X.
    Shen X.
    Sun H.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2019, 39 (08): : 169 - 175
  • [24] Enhancing the Resilience of Operational Microgrids Through a Two-Stage Scheduling Strategy Considering the Impact of Uncertainties
    Younesi, Abdollah
    Shayeghi, Hossein
    Siano, Pierluigi
    Safari, Amin
    Alhelou, Hassan Haes
    IEEE ACCESS, 2021, 9 : 18454 - 18464
  • [25] Study on two-stage optimal scheduling of DC distribution networks considering flexible load response
    Chen, Lei
    Yang, Man
    Jiang, Yuqi
    Zheng, Shencong
    Li, Yifei
    You, Xiaoyan
    Chen, Hongkun
    IET ELECTRIC POWER APPLICATIONS, 2024, 18 (11) : 1690 - 1701
  • [26] Two-stage optimal scheduling of integrated energy system considering source-load uncertainty
    Zhu X.
    Jiang Q.
    Liu M.
    Luo H.
    Long W.
    Huang L.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (08): : 9 - 16and32
  • [27] Two-stage optimal robust scheduling of hybrid energy system considering the demand response programs
    Daneshvar, Mohammadreza
    Mohammadi-Ivatloo, Behnam
    Zare, Kazem
    JOURNAL OF CLEANER PRODUCTION, 2020, 248
  • [28] Two-Stage Optimal Scheduling Strategy for Micro-Grid Considering EV Default Uncertainty
    Li C.
    Xu M.
    Cai S.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2023, 38 (07): : 1838 - 1851
  • [29] Scheduling two-stage jobs on multiple flowshops
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    THEORETICAL COMPUTER SCIENCE, 2019, 776 : 117 - 124
  • [30] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481