Integrated optimization of worker assignment, batch splitting and scheduling for a hybrid assembly line-seru production system

被引:2
|
作者
Li, Bingbing [1 ]
Wu, Yinghui [1 ]
机构
[1] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang 212100, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid seru production system; Worker assignment; Batch splitting and scheduling; Variable neighborhood search; CONVERSION; EVOLUTION;
D O I
10.1016/j.cie.2024.110399
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies an integrated optimization problem of worker assignment, batch splitting and scheduling for a hybrid assembly line-seru production system, which includes multiple serus and a short assembly line. The worker assignment involves assigning each multi-skilled worker to a seru or the assembly line, and assigning the worker tasks to perform. The batch splitting determines the number of subbatches split for each batch, the size of each subbatch, and in which seru the production of each subbatch is performed. The batch scheduling aims to optimize the process sequences of batches in serus and on the assembly line. For the integrated optimization problem, we propose a mixed-integer nonlinear programming model that minimizes the makespan. To solve large-scale instances of the problem, we develop a tailored hybrid variable neighborhood search algorithm with a four-layer solution coding scheme and four novel neighborhood structures. We validate the effectiveness of our model and solution algorithm on two sets of instances. The experimental results indicate that the proposed hybrid metaheuristic achieves a significant reduction in makespan, with an improvement of up to 20.94% compared to the solutions obtained by the Gurobi optimization solver within one hour. In addition, we demonstrate the advantage of optimized batch splitting by comparing it with no batch splitting and equal-size batch splitting strategies in the literature.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Scheduling problem in seru production system considering DeJong's learning effect and job splitting
    Zhang, Zhe
    Song, Xiaoling
    Huang, Huijun
    Yin, Yong
    Lev, Benjamin
    ANNALS OF OPERATIONS RESEARCH, 2022, 312 (02) : 1119 - 1141
  • [22] Robust optimization for the integrated worker-cell assignment and sequencing problem in a lean U-shaped assembly line
    Ayough, Ashkan
    Khorshidvand, Behrooz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 178
  • [23] A reinforcement learning driven two-stage evolutionary optimisation for hybrid seru system scheduling with worker transfer
    Wu, Yuting
    Wang, Ling
    Chen, Jing-fang
    Zheng, Jie
    Pan, Zixiao
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (11) : 3952 - 3971
  • [24] A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line
    Nishi, Tatsushi
    Konishi, Masami
    Ago, Masatoshi
    COMPUTERS & CHEMICAL ENGINEERING, 2007, 31 (10) : 1205 - 1221
  • [25] Multi-skilled worker assignment in seru production system for the trade-off between production efficiency and workload fairness
    Zeng, Shaoyu
    Wu, Yinghui
    Yu, Yang
    KYBERNETES, 2023, 52 (09) : 3495 - 3518
  • [26] Algorithm for Integrated Production and Utility System Scheduling of Batch Plants
    Agha, Mujtaba H.
    Thery, Raphaele
    Hetreux, Gilles
    Hait, Alain
    Le Lann, Jean M.
    10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 1497 - 1502
  • [27] Optimization of Scheduling for Small Batch and Customized Mixed-model Assembly Production
    Yang, Xiao-ying
    Xu, Lin-ming
    Wang, Yu-zhe
    PROCEEDINGS OF THE 3RD ANNUAL 2017 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2017), 2017, 50 : 83 - 89
  • [28] Reinforcement Learning Driven Cross-Trained Worker Assignment Approach Based on Big Models: A Study for A Hybrid Seru Production System Considering Learning Effect
    Li, Taixin
    Ye, Chenxi
    Wu, Lang
    Liu, Feng
    Yu, Chengxiao
    Computational Intelligence, 2025, 41 (02)
  • [29] Integrated batch production planning and scheduling optimization considering processing time uncertainty
    Gao, Jingxing
    Guo, Ziqing
    Liu, Linlin
    Dong, Yachao
    Du, Jian
    OPTIMIZATION AND ENGINEERING, 2024, 25 (04) : 2369 - 2400
  • [30] Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
    Yin, Yunqiang
    Yang, Yongjian
    Wang, Dujuan
    Cheng, T. C. E.
    Wu, Chin-Chia
    NAVAL RESEARCH LOGISTICS, 2018, 65 (05) : 393 - 409