A Q-learning based hyper-heuristic scheduling algorithm with multi-rule selection for sub-assembly in shipbuilding

被引:0
|
作者
Wang, Teng [1 ]
Zhang, Yahui [2 ]
Hu, Xiaofeng [1 ,3 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Shanghai Jiao Tong Univ, Inst Marine Equipment, 5G Intelligent Mfg Res Ctr, Shanghai 200240, Peoples R China
[3] Shanghai Key Lab Adv Mfg Environm, Shanghai 200240, Peoples R China
关键词
Spatial scheduling; Sub-assembly; Multi-rule selection; Hyper-heuristic; Q; -learning; RESOURCE; SHOP; EVOLUTIONARY; BLOCKS;
D O I
10.1016/j.cie.2024.110567
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Sub-assembly is the basic stage of ship hull construction. It is necessary to optimize the scheduling of subassembly to shorten its assembly cycle and ensure the normal execution of subsequent processes. The scheduling problem of sub-assembly is an NP-hard problem that should take into consideration both spatial layout and temporal schedule. In this work, a mathematical model for scheduling the sub-assembly is established, and a Qlearning based hyper-heuristic with multi-spatial layout rule selection is proposed. Specifically, a spatial layout method based on multi-rule selection is proposed first. In various scenarios, distinct spatial layout rules are chosen to derive an appropriate spatial arrangement. Subsequently, a hyper-heuristic algorithm based on Qlearning is crafted to optimize the scheduling sequence and the selection of spatial layout rules. As a verification, numerical experiments are carried out in cases of different scales collected from a large shipyard. The effectiveness of the proposed algorithm is verified by comparing it with different spatial layout algorithms, various heuristic operators, existing well-known hyper-heuristic methods, and other Q-learning based scheduling methods. The results suggest that the proposed algorithm outperforms other comparison algorithms in most testing cases.
引用
收藏
页数:24
相关论文
共 50 条
  • [21] A Q-Learning-Based Hyper-Heuristic Evolutionary Algorithm for the Distributed Flexible Job-Shop Scheduling Problem
    Wu, Fang-Chun
    Qian, Bin
    Hu, Rong
    Zhang, Zi-Qi
    Wang, Bin
    ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, ICIC 2023, PT I, 2023, 14086 : 251 - 261
  • [22] Q-learning based hyper-heuristic with clustering strategy for combinatorial optimization: A case study on permutation flow-shop scheduling problem
    Yang, Yuan-yuan
    Qian, Bin
    Li, Zuocheng
    Hu, Rong
    Wang, Ling
    COMPUTERS & OPERATIONS RESEARCH, 2025, 173
  • [23] A genetic based hyper-heuristic algorithm for the job shop scheduling problem
    Yan, Jin
    Wu, Xiuli
    2015 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS IHMSC 2015, VOL I, 2015, : 161 - 164
  • [24] Green location routing problem with flexible multi-compartment for source-separated waste: A Q-learning and multi-strategy-based hyper-heuristic algorithm
    Shang, Chunjian
    Ma, Liang
    Liu, Yong
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 121
  • [25] Multi-objective Q-learning-based hyper-heuristic with Bi-criteria selection for energy-aware mixed shop scheduling
    Cheng, Lixin
    Tang, Qiuhua
    Zhang, Liping
    Zhang, Zikai
    SWARM AND EVOLUTIONARY COMPUTATION, 2022, 69
  • [26] A multi-objective hyper-heuristic algorithm based on adaptive epsilon-greedy selection
    Yang, Tailong
    Zhang, Shuyan
    Li, Cuixia
    COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (02) : 765 - 780
  • [27] A multi-objective hyper-heuristic algorithm based on adaptive epsilon-greedy selection
    Tailong Yang
    Shuyan Zhang
    Cuixia Li
    Complex & Intelligent Systems, 2021, 7 : 765 - 780
  • [28] A hyper-heuristic selector algorithm for cloud computing scheduling based on workflow features
    Kenari, Abdolreza Rasouli
    Shamsi, Mahboubeh
    OPSEARCH, 2021, 58 (04) : 852 - 868
  • [29] A hyper-heuristic selector algorithm for cloud computing scheduling based on workflow features
    Abdolreza Rasouli Kenari
    Mahboubeh Shamsi
    OPSEARCH, 2021, 58 : 852 - 868
  • [30] A Q-learning-based hyper-heuristic evolutionary algorithm for the distributed flexible job-shop scheduling problem with crane transportation
    Zhang, Zi-Qi
    Wu, Fang-Chun
    Qian, Bin
    Hu, Rong
    Wang, Ling
    Jin, Huai-Ping
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 234