Duration and resource constraint prediction models for construction projects using regression machine learning method

被引:2
|
作者
Selvam, Gopinath [1 ]
Kamalanandhini, Mohan [1 ]
Velpandian, Muthuvel [1 ]
Shah, Sheema [1 ]
机构
[1] SRM Inst Sci & Technol, Coll Engn & Technol, Dept Civil Engn, Kattankulathur, India
关键词
Construction management; Resource constraint; Duration constraint; Prediction; Machine learning; Uncertainties;
D O I
10.1108/ECAM-06-2023-0582
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeThe construction projects are highly subjected to uncertainties, which result in overruns in time and cost. Realistic estimates of workforce and duration are imperative for construction projects to attain their intended objectives. The aim of this study is to provide accurate labor and duration estimates for the construction projects, considering actual uncertainties.Design/methodology/approachThe dataset was formulated from the information collected from 186 construction projects through direct interviews, group discussions and questionnaire methods. The actual uncertainties and exposure conditions of construction activities were recorded. The data were verified with the standard guideline to remove the outliers. The prediction model was developed using support vector regression (SVR), a machine learning (ML) method. The performance was evaluated using the widely adopted regression metrics. Further, the cross validation was made with the visualization of residuals and predicted errors, ridge regression with transformed target distribution and a Gaussian Naive Bayes (NB) regressor.FindingsThe prediction models predicted the duration and labor requirements with the consideration of actual uncertainties. The residual plot indicated the appropriate use of SVR to develop the prediction model. The duration (DC) and resource constraint (RC) prediction models obtained 80 and 82% accuracy, respectively. Besides, the developed model obtained better accuracy for the training and test scores than the Gaussian NB regressor. Further, the range of the explained variance score and R2 was from 0.95 to 0.97, indicating better efficiency compared with other prediction models.Research limitations/implicationsThe researchers will utilize the research findings to estimate the duration and labor requirements under uncertain conditions and further improve the construction project management practices.Practical implicationsThe research findings will enable industry practitioners to accurately estimate the duration and labor requirements, considering historical uncertain conditions. A precise estimation of resources will ensure the attainment of the intended project outcomes.Social implicationsDelays in construction projects will be reduced by implementing the research findings, which significantly ensures the effective utilization of resources and attainment of other economic benefits. The policymakers will develop a guideline to develop a database to collect the uncertainties of the construction projects and relatively estimate the resource requirements.Originality/valueThis is the first study to consider the actual uncertainties of construction projects to develop RC and DC prediction models. The developed prediction models accurately estimate the duration and labor requirements with minimal computational time. The industry practitioners will be able to accurately estimate the duration and labor requirements using the developed models.
引用
收藏
页数:21
相关论文
共 50 条
  • [31] Prediction of duration and construction cost of road tunnels using Gaussian process regression
    Mahmoodzadeh, Arsalan
    Mohammadi, Mokhtar
    Abdulhamid, Sazan Nariman
    Ibrahim, Hawkar Hashim
    Ali, Hunar Farid Hama
    Nejati, Hamid Reza
    Rashidi, Shima
    GEOMECHANICS AND ENGINEERING, 2022, 28 (01) : 65 - 75
  • [32] Prediction of duration and construction cost of road tunnels using Gaussian process regression
    Mahmoodzadeh A.
    Mohammadi M.
    Abdulhamid S.N.
    Ibrahim H.H.
    Ali H.F.H.
    Nejati H.R.
    Rashidi S.
    Geomechanics and Engineering, 2022, 28 (01): : 65 - 75
  • [33] Developing six hybrid machine learning models based on gaussian process regression and meta-heuristic optimization algorithms for prediction of duration and cost of road tunnels construction
    Mahmoodzadeh, Arsalan
    Nejati, Hamid Reza
    Mohammadi, Mokhtar
    Hashim Ibrahim, Hawkar
    Khishe, Mohammad
    Rashidi, Shima
    Hussein Mohammed, Adil
    Tunnelling and Underground Space Technology, 2022, 130
  • [34] Developing six hybrid machine learning models based on gaussian process regression and meta-heuristic optimization algorithms for prediction of duration and cost of road tunnels construction
    Mahmoodzadeh, Arsalan
    Nejati, Hamid Reza
    Mohammadi, Mokhtar
    Ibrahim, Hawkar Hashim
    Khishe, Mohammad
    Rashidi, Shima
    Mohammed, Adil Hussein
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 130
  • [35] Cost Estimation of Civil Construction Projects using Machine Learning Paradigm
    Arage, Sphurti S.
    Dharwadkar, Nagaraj V.
    2017 INTERNATIONAL CONFERENCE ON I-SMAC (IOT IN SOCIAL, MOBILE, ANALYTICS AND CLOUD) (I-SMAC), 2017, : 594 - 599
  • [36] Cost Estimation of Metro Construction Projects Using Interpretable Machine Learning
    Meng, Chuncheng
    Qu, Daoyuan
    Duan, Xiaochen
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2024, 38 (06)
  • [37] Visiting Time Prediction Using Machine Learning Regression Algorithm
    Hapsari, Indri
    Surjandari, Isti
    Komarudin
    2018 6TH INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY (ICOICT), 2018, : 495 - 500
  • [38] Prediction of composite indicators using combined method of extreme learning machine and locally weighted regression
    Ruksenaite, Jurga
    Vaitkus, Pranas
    NONLINEAR ANALYSIS-MODELLING AND CONTROL, 2012, 17 (02): : 238 - 251
  • [39] Safety performance prediction and modification strategies for construction projects via machine learning techniques
    Abbasianjahromi, Hamidreza
    Aghakarimi, Mehdi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (03) : 1146 - 1164
  • [40] Numerical experiments on tsunami flow depth prediction for clustered areas using regression and machine learning models
    Masato Kamiya
    Yasuhiko Igarashi
    Masato Okada
    Toshitaka Baba
    Earth, Planets and Space, 74