共 50 条
- [25] Time evolution of scour and deduction of the required minimum test duration for a clear-water scour test at a bridge pier PROCEEDINGS OF THE 4TH IASME/WSEAS INTERNATIONAL CONFERENCE ON WATER RESOURCES, HYDRAULICS AND HYDROLOGY, 2009, : 168 - 174