共 50 条
- [42] POSSIBILITY OF HAZARD ESTIMATION AT A NUCLEAR-POWER PLANT - RESEARCH AT NSR JADERNA ENERGIE, 1984, 30 (02): : 74 - 79
- [44] Estimation of Extreme Sea Level in the Akkuyu Nuclear Power Plant Area Russian Meteorology and Hydrology, 2020, 45 : 39 - 44
- [47] TECHNICAL AND ECONOMIC ESTIMATION OF DIFFERENT NUCLEAR POWER PLANT BUILDING LINES BRENNSTOFF-WARME-KRAFT, 1969, 21 (08): : 427 - &
- [48] An Approach on Coordinative Peaking Optimization for Power System With Nuclear Power Plant Participation Dianwang Jishu/Power System Technology, 2019, 43 (03): : 928 - 934
- [50] Integrated approach to optimize CAREM 25 nuclear power plant ADVANCES IN SAFETY, RELIABILITY AND RISK MANAGEMENT, 2012, : 3018 - 3023