EFFICIENT ALGORITHMS FOR THE MULTI-STAGE FLEXIBLE FLOW SHOP SCHEDULING PROBLEM WITH TRANSPORTATION AND UNLOADING TIMES

被引:0
|
作者
Hidri, Lotfi [1 ]
Tlija, Mehdi [1 ]
机构
[1] King Saud Univ, Dept Ind Engn, Coll Engn, Riyadh, Saudi Arabia
关键词
Multi-stage flexible flow shop; unloading time; transportation time; heuristic; lower bounds; SEQUENCE-DEPENDENT SETUP; PARALLEL MACHINES; HYBRID FLOWSHOP; RELEASE DATES; MINIMIZE; MAKESPAN; MODEL; LAGS;
D O I
10.23055/ijietap.2024.31.4.9701
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Improving efficiency in multi-stage flexible flowshop operations is essential for modern industrial systems. Optimizing total completion time while simultaneously considering the unloading and transportation times is vital for enhanced productivity and cost-effectiveness. This study delves into the intricate realm of flexible flow shop scheduling, particularly focusing on scenarios prevalent in modern manufacturing processes such as sand casting. Despite limited exploration in prior literature for particular cases, the significance of this problem underscores the pressing need for efficient algorithms and the exploration of new problem properties. Notably, we unveil the symmetry inherent in the problem, where scheduling from the initial stage to the final one, or vice versa, yields identical optimal solutions, thereby augmenting solution quality. Given the strongly NP- Hard nature of the problem, approximate solutions are preferred, especially for medium to large-scale instances. To address this challenge, we propose a novel two-phase heuristic approach, encompassing both a constructive phase and an improvement phase. Leveraging an existing efficient heuristic tailored for parallel machine scheduling, our method extends to efficiently incorporate considerations for unloading and transportation times. The efficacy of the two-phase heuristic lies in its ability to consistently generate high-quality schedules at each stage. Furthermore, we introduce efficient lower bounds derived from estimating the minimum idle time within each stage, drawing from insights in polynomial parallel machine scheduling with a focus on flow time minimization in preceding stages. These lower bounds serve as critical benchmarks for evaluating the performance of the two-phase heuristic against the relative gap performance measure. Extensive experimentation on benchmark test problems underscores the effectiveness of our proposed algorithms, with results demonstrating an average computation time of 9.48 seconds and a mean relative gap of only 2.42% across varying job and stage quantities up to 200 jobs and 10 stages.
引用
收藏
页码:709 / 733
页数:24
相关论文
共 50 条
  • [41] Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization
    Ribas, Imma
    Companys, Ramon
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 30 - 39
  • [42] Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
    Hasani, Ali
    Hosseini, Seyed Mohammad Hassan
    COMPUTERS & OPERATIONS RESEARCH, 2022, 138
  • [43] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [44] Flexible job shop dual resource scheduling problem considering loading and unloading
    Wu X.-L.
    Xiao X.
    Zhao N.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (10): : 2475 - 2485
  • [45] Multi-cyclic flow shop scheduling: an application in multi-stage, multi-product production processes
    ElNajdawi, MK
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (12) : 3323 - 3332
  • [46] Efficient algorithms for flexible job shop scheduling with parallel machines
    Kubiak, Wieslaw
    Feng, Yanling
    Li, Guo
    Sethi, Suresh P.
    Sriskandarajah, Chelliah
    NAVAL RESEARCH LOGISTICS, 2020, 67 (04) : 272 - 288
  • [47] Heuristic algorithms for two-stage flexible flow shop scheduling with head group constraint
    Li, Zhantao
    Chen, Qingxin
    Mao, Ning
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2012, 48 (22): : 189 - 198
  • [48] Scheduling of multi-component products in a two-stage flexible flow shop
    Nikzad, Fatemeh
    Rezaeian, Javad
    Mandavi, Iraj
    Rastgar, Iman
    APPLIED SOFT COMPUTING, 2015, 32 : 132 - 143
  • [49] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Yi Sun
    Chaoyong Zhang
    Liang Gao
    Xiaojuan Wang
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 723 - 739
  • [50] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Sun, Yi
    Zhang, Chaoyong
    Gao, Liang
    Wang, Xiaojuan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8): : 723 - 739