Replacement strategy of the EU-DEMO and CFETR breeding blanket pipes

被引:0
|
作者
Mozzillo, Rocco [1 ]
Bachmann, Christian [2 ]
Janeschitz, Guenter [3 ]
Claps, Vincenzo [1 ]
Garrido, Oriol Costa [4 ]
Pan, Hongtao [5 ]
Li, Fei [6 ]
Sorgente, Donato [1 ]
机构
[1] Basilicata Univ, CREATE, Engn Sch, Campus Macchia Romana PZ, I-85100 Potenza, Italy
[2] EUROfusion, Boltzmannstr 2, D-85748 Garching, Germany
[3] Max Planck Inst Plasma Phys, D-85748 Garching, Germany
[4] Jozef Stefan Inst, Jamova Cesta 39, Ljubljana SI-1000, Slovenia
[5] Chinese Acad Sci, Inst Plasma Phys, POB 1126,Shushanhu Rd 350, Hefei, Anhui, Peoples R China
[6] BUAA, Sch Mech Engn & Automat, Xueyuan Rd 37, Beijing, Peoples R China
关键词
DEMO; CFETR; Remote maintenance; Breeding blanket; Feeding pipes; MAINTENANCE; SYSTEMS; DESIGN; CONFIGURATION; INTEGRATION;
D O I
10.1016/j.fusengdes.2024.114311
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Both EU -DEMO and CFETR need a workable replacement scheme for their tritium breeding blanket (BB). The radioactive environment dictates that all associated operations must be carried out through remotely controlled tools. Accessing and extracting the large BB segments requires their feeding pipes to be removed first from the upper vessel port and later re-installed. In the current design, each of the 80 BB segments is connected with four feeding pipes, two for cooling and two for tritium extraction. Thus, in the process of BB maintenance operation, 320 pipes must be cut, removed and rewelded. The developed concept for this task is presented here. It aims at reducing the associated plant downtime, thereby increasing the overall plant availability. Features underpinning this integrated BB pipe service concept are: (i) parallel pipe service operations, (ii) pipes in each upper port are grouped in a pipe forest and handled as a single component, (iii) the configuration of the individual pipes is standardized such that cutting and joining locations are aligned and with good accessibility from the top, (iv) the number of pipe sizes is limited to two, reducing the number of required tool sets, and (v) the same pipe configuration is adopted in each of the 16 upper ports. The paper will present design solutions and the progress on the manufacturing of prototypes developed for the challenging cutting and welding tasks from both within and outside, as well as the leak detection methodology and pipe stub handling. Prototypes will be used to perform design validation and verification on dedicated test benches currently being implemented in close collaboration between European laboratories and the Comprehensive Research fAcility for Fusion Technology (CRAFT) at ASIPP in China.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Study of the EU-DEMO WCLL Breeding Blanket Primary Cooling Circuits Thermal-Hydraulic Performances during Transients Belonging to LOFA Category
    Ciurluini, Cristiano
    Giannetti, Fabio
    Del Nevo, Alessandro
    Caruso, Gianfranco
    [J]. ENERGIES, 2021, 14 (06)
  • [32] Permeator Simulations for the EU-DEMO Fuel Cycle
    Hoerstensmeyer, Yannick Nicolas
    Tosti, Silvano
    Santucci, Alessia
    Bruni, Giacomo
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2020, 76 (03) : 232 - 237
  • [33] Ferromagnetic forces acting on the EU-DEMO divertor
    Di Mambro, G.
    Maffucci, A.
    Mazzone, G.
    Rubinacci, G.
    Ventre, S.
    Villone, F.
    You, J. H.
    [J]. FUSION ENGINEERING AND DESIGN, 2023, 190
  • [34] Optimizing the EU-DEMO pellet fuelling scheme
    Lang, Peter Thomas
    Cismondi, Fabio
    Day, Christian
    Fable, Emiliano
    Frattolillo, Antonio
    Gliss, Curt
    Janky, Filip
    Pegourie, Bernard
    Ploeckl, Bernhard
    [J]. FUSION ENGINEERING AND DESIGN, 2020, 156
  • [35] The design of a slit ICRF antenna in EU-DEMO
    Kasahara, H.
    Saito, K.
    Seki, T.
    Mutoh, T.
    [J]. FUSION ENGINEERING AND DESIGN, 2023, 189
  • [36] Matter Injection in EU-DEMO: The Preconceptual Design
    Ploeckl, B.
    Lang, P. T.
    Frattolillo, A.
    Igitkhanov, Y.
    Pegourie, B.
    Fable, E.
    Day, Chr.
    Gliss, C.
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2021, 77 (04) : 266 - 278
  • [37] Design study on the new EU DEMO HCPB breeding blanket: Thermal analysis
    Zhou, Guangming
    Hernandez, Francisco
    Boccaccini, Lorenzo V.
    Chen, Hongli
    Ye, Minyou
    [J]. PROGRESS IN NUCLEAR ENERGY, 2017, 98 : 167 - 176
  • [38] Status of the EU DEMO breeding blanket manufacturing R&D activities
    Forest, Laurent
    Aktaa, Jarir
    Boccaccini, Lorenzo Virgilio
    Emmerich, Thomas
    Eugen-ghidersa, Bradut
    Fondant, Gilles
    Froio, Antonio
    Puma, Antonella Li
    Namburi, Hygreeva
    Neuberger, Heiko
    Rey, Joerg
    Savoldi, Laura
    Sornin, Denis
    Vala, Ladislav
    [J]. FUSION ENGINEERING AND DESIGN, 2020, 152
  • [39] Investigation on cooling performance of WCLL breeding blanket first wall for EU DEMO
    Jiang, Kecheng
    Martelli, Emanuela
    Agostini, Pietro
    Liu, Songlin
    Del Nevo, Alessandro
    [J]. FUSION ENGINEERING AND DESIGN, 2019, 146 : 2748 - 2756
  • [40] Numerical investigation of the structural performances of the EU-DEMO Water-Cooled Lead Lithium breeding blanket equipped with helicoidal double-walled tubes
    Noguerón, J.A.
    Di Maio, P.A.
    Bongiovì, G.
    Catanzaro, I.
    Chiovaro, P.
    Giambrone, S.
    Quartararo, A.
    Vallone, E.
    Fernández-Berceruelo, I.
    Arena, P.
    [J]. Fusion Engineering and Design, 2024, 208