Design method and experimental investigation of two-stage prestressed precast continuous beams

被引:5
|
作者
Chen, Ying [1 ]
Wang, Chun -Lin [1 ,3 ]
Zeng, Bin [2 ]
Zhu, Hong [1 ]
机构
[1] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 210096, Peoples R China
[2] MCC Grp, Cent Res Inst Bldg & Construct, Beijing 100088, Peoples R China
[3] Southeast Univ, Sch Civil Engn, Nanjing 210096, Peoples R China
基金
中国国家自然科学基金;
关键词
Two-stage prestressed; Precast continuous beam; Construction stage; Service stage; Flexural performance; Experimental investigation; Design method; MOMENT REDISTRIBUTION; CONCRETE; BEHAVIOR; BENEFITS;
D O I
10.1016/j.istruc.2024.106405
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Excessive prestress will lead to significant negative deflection and even precast prestressed beam unit cracking during production and transportation. Meanwhile, many rebars must be installed to effectively control the occurrence of cracks at the beam ends during the service stage, resulting in difficulties during the construction process. To effectively distribute the initial tension of prestressed strands in precast prestressed beams, this paper proposed two-stage prestressed precast continuous beam (TPPCB) to balance the load during construction and service stages by tensioning different prestressed strands. This study conducted a comparative test between the TPPCB and cast-in-place prestressed continuous beam (CPCB) during the construction stage and under vertical loading conditions. The test results indicated that, compared to the specimen CPCB, the specimen TPPCB exhibited a lesser negative deflection following the completion of the construction stage. When the specimen TPPCB is designed according to the mechanical model of two-stage tension prestress, its mechanical performance can be similar to those of the specimen CPCB in both construction and service stages. The crack range at the top of the middle support beam was relatively smaller in specimen TPPCB than in specimen CPCB. Furthermore, the crack width at the top of the middle support beam in TPPCB is significantly greater when compared to specimen CPCB. Compared to the specimen CPCB, the mechanical performance of the specimen TPPCB resembled those of a two-span simply supported beam once the penetrating cracks were formed. Due to the concentrated and significant cracks at the middle support section of specimen TPPCB, the premature failure of this region led to the structural failure of the continuous beam. Consequently, the specimen TPPCB exhibited stronger deformation capabilities. When the specimen TPPCB was subjected to dead and live loads, the compressive stress experienced by the fibers at the top of the concrete in the midspan of precast prestressed beam unit was the highest, making it the critical and vulnerable section. The high compressive stress in the top concrete of the midspan section concrete of the precast prestressed beam unit resulted in a vulnerability of specimen TPPCB to failure due to midspan section concrete crushing during service stage or extreme conditions. Design equations and design processes are presented according to the design goal for specimen TPPCB.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] An experimental investigation on the integration of two-stage dehumidification and regenerative evaporative cooling
    La, D.
    Dai, Y. J.
    Li, Y.
    Tang, Z. Y.
    Ge, T. S.
    Wang, R. Z.
    APPLIED ENERGY, 2013, 102 : 1218 - 1228
  • [43] An experimental investigation on the integration of two-stage dehumidification and regenerative evaporative cooling
    La, D.
    Dai, Y.J.
    Li, Y.
    Tang, Z.Y.
    Ge, T.S.
    Wang, R.Z.
    Applied Energy, 2013, 102 : 1218 - 1228
  • [44] Selection of the initial design for the two-stage continual reassessment method
    Jia, Xiaoyu
    Ivanova, Anastasia
    Lee, Shing M.
    JOURNAL OF BIOPHARMACEUTICAL STATISTICS, 2017, 27 (03) : 495 - 506
  • [45] How to design concrete produced by a two-stage concreting method
    Abdelgader, HS
    CEMENT AND CONCRETE RESEARCH, 1999, 29 (03) : 331 - 337
  • [46] Prostatectomy by the two-stage method
    Irwin, WK
    BRITISH MEDICAL JOURNAL, 1937, 1937 : 639 - 640
  • [47] Experimental study and model simulation of a two-stage continuous polymerization process for polystyrene
    Yoon, WJ
    KOREAN JOURNAL OF CHEMICAL ENGINEERING, 1996, 13 (01) : 88 - 96
  • [48] Prostatectomy by the two-stage method
    Irwin, WK
    BRITISH MEDICAL JOURNAL, 1937, 1937 : 528 - 529
  • [49] Prostatectomy by the Two-stage Method
    Galbraith, WW
    BRITISH MEDICAL JOURNAL, 1937, 1937 : 472 - 473
  • [50] Experimental investigation on overall stability capacity of overhanging beams and two-span continuous beams
    Zhang, Yaochun
    Zhang, Zhuangnan
    Wang, Chungang
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2007, 28 (06): : 167 - 174