Construction of SuperKEKB vacuum control system and its eight years operation experience

被引:0
|
作者
Terui, S. [1 ]
Ishibashi, T. [1 ]
Hisamatsu, H. [1 ]
Suetsugu, Y. [1 ]
Yoshifuji, N. [2 ]
Shirai, M. [1 ]
Shibata, K. [1 ]
Kanazawa, K. [1 ]
Nakamura, T. T. [1 ]
Sasaki, S. [1 ]
Yao, M. [1 ]
机构
[1] High Energy Accelerator Res Org KEK, 1-1 Oho, Tsukuba, Ibaraki 3050801, Japan
[2] East Japan Inst Technol Co Ltd, 2-23-15 Ohmikacho, Hitachi, Ibaraki 3191221, Japan
关键词
Accelerator; Vacuum; Control system; Interlock; Trouble;
D O I
10.1016/j.nima.2024.169814
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
SuperKEKB has two main rings (MRs), namely low- and high-energy rings, with circumferences of 3 km; beam transport (BT) lines; and a positron damping ring (PDR). We upgraded the MRs and BT line vacuum control systems and designed a new PDR vacuum control system for upgrading KEKB to SuperKEKB. Here, we describe the basic configuration of the vacuum control system, which includes the interlock logic (gate valve open/closed control, non-evaporable getter pump activation, and beam abortion). We subsequently present the collimator driving system and the cooling water control system for the beam pipe of the final focusing superconducting quadrupole magnet as examples of special SuperKEKB vacuum control systems. Examples of problems in the SuperKEKB vacuum control system, including the discharge at the high-voltage connector of the ion pump, stoppage of the cooling water pump for the vacuum system, and failure of the collimator position measurement device are described.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Study on construction of computer curriculum system and its operation tactics
    Zhu Yangqing
    Advanced Computer Technology, New Education, Proceedings, 2007, : 1135 - 1138
  • [22] Eight years' experience of regional audit: an assessment of its value as a clinical governance tool
    John, H.
    Paskins, Z.
    Hassell, A.
    Rowe, I. F.
    CLINICAL MEDICINE, 2010, 10 (01) : 20 - 25
  • [23] IMPLEMENTATION AND MANAGEMENT OF LF CONTROL AND ELIMINATION PROGRAMMES: EIGHT YEARS OF EXPERIENCE FROM TANZANIA
    Malecela, Mwele N.
    Kilima, Peter
    Mackenzie, Charles D.
    AMERICAN JOURNAL OF TROPICAL MEDICINE AND HYGIENE, 2008, 79 (06): : 327 - 327
  • [24] Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade
    Lushtak, Yevgeniy
    Burke, David
    Li, Yulin
    Lyndaker, Aaron
    Liu, Xianghong
    Ying, Laurel
    Lushtak, Yevgeniy (yl622@cornell.edu), 2021, Elsevier Ltd (186)
  • [25] Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade
    Lushtak, Yevgeniy
    Burke, David
    Li, Yulin
    Lyndaker, Aaron
    Liu, Xianghong
    Ying, Laurel
    VACUUM, 2021, 186
  • [26] FLUIDBED SOYBEAN PREPARATION SYSTEM - EXPERIENCE AFTER 5 YEARS OF OPERATION
    MOORE, JG
    JOURNAL OF THE AMERICAN OIL CHEMISTS SOCIETY, 1988, 65 (04) : 511 - 511
  • [27] The gastronomic heritage in the Ile-de-France region, eight years' experience of a heritage under construction
    Faure, Julie
    IN SITU-REVUE DE PATRIMOINES, 2019, (41):
  • [28] Networks firing control system and its construction
    Xu, Hui-Gang
    Guo, Zhi
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2007, 31 (02): : 139 - 142
  • [29] 2 YEARS OF EXPERIENCE WITH THE PETRA CONTROL-SYSTEM
    不详
    BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1981, 26 (02): : 115 - 115
  • [30] 2 YEARS OF EXPERIENCE WITH THE PETRA CONTROL-SYSTEM
    不详
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1981, 28 (03) : 2382 - 2384