Rational capacity investment for renewable hydrogen-based steelmaking systems: A multi-stage expansion planning strategy

被引:0
|
作者
Sheng, Kangling [1 ]
Wang, Xiaojun [1 ]
Si, Fangyuan [1 ]
Zhou, Yue [2 ]
Liu, Zhao [1 ]
Hua, Haochen [3 ]
Wang, Xihao [1 ]
Duan, Yuge [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Elect Engn, Beijing 100044, Peoples R China
[2] Cardiff Univ, Sch Engn, Cardiff CF24 3AA, Wales
[3] Hohai Univ, Sch Energy & Elect Engn, Nanjing 211100, Peoples R China
关键词
Multi-stage expansion planning; Rational capacity investment; Rolling-horizon approach; Renewable hydrogen-based steelmaking;
D O I
10.1016/j.apenergy.2024.123746
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
To improve energy efficiency and mitigate environmental impact, the iron and steel industry (ISI) is responsible for implementing a low -carbon transition. The renewable hydrogen -based steelmaking system (RHSS) has emerged as an innovative energy system in the pathway of reducing the carbon footprint of ISI. Nonetheless, the sustainable development requirements of RHSS emphasize the critical need for well -planned capacity investments to boost its economic viability. This study introduces a novel planning strategy for RHSS referred to as a multi -stage expansion planning (MSEP) model, which is aimed to minimize the levelized cost of crude steel over the planning horizon from 2025 to 2050 (EU climate neutrality year). The MSEP model incorporates the construction sequence and dynamic techno-economic parameters to formulate investment strategies that adapt to changing system requirements and external conditions over the planning horizon. To address the complexity of the MSEP model, a rolling -horizon approach (RHA) is proposed to solve the model sequentially while integrating updated information. The proposed approach is benchmarked against both the single -stage approach and the perfect -sight approach through case studies. The numerical results show that the proposed RHA (i) guarantees a rational capacity investment strategy for RHSS considering the construction sequence and dynamic techno-economic parameters over multiple planning stages; (ii) achieves a reduction in the levelized cost of crude steel by approximately 50% relative to the single -stage approach; (iii) resolves the convergence issues encountered with the perfect -sight approach while achieving an optimal solution in a reasonable time frame. Additionally, sensitivity analysis evaluates the uncertainties of multiple factors on the planning results, while the robustness analysis confirms the applicability and adaptability of RHA across various scenarios.
引用
收藏
页数:20
相关论文
共 37 条
  • [1] Optimum investment strategy for hydrogen-based steelmaking project coupled with multiple uncertainties
    Xu, Shuo
    Wang, Xiaoyang
    Jiang, Yingqi
    Yu, Biying
    Wei, Yi-Ming
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2024, 356
  • [2] Multi-stage and multi-timescale optimal energy management for hydrogen-based integrated energy systems
    Fang, Xiaolun
    Dong, Wei
    Wang, Yubin
    Yang, Qiang
    [J]. ENERGY, 2024, 286
  • [3] Performance Investigation of Multi-Stage Hydrogen-Based Sorption Heat Pump
    Syed, Shajiullah Naveed
    Jena, Satyasreet
    Sharma, Vinod Kumar
    Kumar, E. Anil
    [J]. FME TRANSACTIONS, 2021, 49 (01): : 121 - 127
  • [4] GA Based Multi-stage Transmission Network Expansion Planning
    Simo, A.
    Kilyeni, St
    Barbulescu, C.
    [J]. SOFT COMPUTING APPLICATIONS, SOFA 2016, VOL 1, 2018, 633 : 47 - 59
  • [5] A Multi-Stage Generation Expansion Planning For Low Carbon Power Systems
    Akbarzade, Hossein
    Amraee, Turaj
    [J]. 2020 28TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2020, : 1253 - 1257
  • [6] Optimal planning of distributed hydrogen-based multi-energy systems
    Liu, Jinhui
    Xu, Zhanbo
    Wu, Jiang
    Liu, Kun
    Guan, Xiaohong
    [J]. APPLIED ENERGY, 2021, 281
  • [7] Simulation based optimization for risk management in multi-stage capacity expansion
    Wan, Xiaotao
    Pekny, J. F.
    Reklaitis, G. V.
    [J]. 16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2006, 21 : 1881 - 1886
  • [8] Multi-stage stochastic long-term planning of grid-connected hydrogen-based energy system based on improved SDDIP
    Cao, Binrui
    Wu, Xiong
    Liu, Bingwen
    Wang, Xiuli
    Wang, Penglei
    Wu, Yunyi
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2023, 17 (13) : 3016 - 3029
  • [9] MODELLING AND COMPUTATION OF OPTIMAL MULTIPLE INVESTMENT TIMING IN MULTI-STAGE CAPACITY EXPANSION INFRASTRUCTURE PROJECTS
    LI, Jinghuan
    Zhang, Shuhua
    LI, Y. U.
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 297 - 314
  • [10] Integrated multi-stage and multi-zone distribution network expansion planning with renewable energy sources and hydrogen refuelling stations for fuel cell vehicles
    Tabandeh, Abbas
    Hossain, M. J.
    Li, Li
    [J]. APPLIED ENERGY, 2022, 319