Analysis of Water Leakage Through Tunnel Lining During Subway Construction

被引:0
|
作者
Pleshko, Mikhail [1 ]
Nikolaev, Petr [1 ]
Davydenko, Alexander [1 ]
Pankratenko, Alexander [1 ]
机构
[1] Natl Univ Sci & Technol MISIS, Moscow Min Inst, Leninskiy Prospekt 4, Moscow 119049, Russia
关键词
Tunnelling; Underground construction; Tunnel boring machine; TBM; Lining; Leakage; INSPECTION; MAINTENANCE; RESPONSES; DEFECTS; GASKETS; FACE; CLAY;
D O I
10.1007/s40515-024-00432-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During constructing metro tunnels using tunnel boring machines in the city of Moscow, groundwater leaks regularly occur either directly through the support structures or shortly after their construction. This circumstance necessitates the organization of labour-intensive and costly work to eliminate leaks by subsequent grouting. In this study, a field investigation was conducted to determine the causes of water manifestations in metro tunnels. As a result of a comprehensive examination of 1580 tunnel lining rings on four sections, various types of leaks were identified, allowing for the development of a classification of water manifestations. Data analysis revealed that most of the water manifestations are associated with the locking tunnel lining ring segment. The likely causes of a significant number of such leaks are defects in the design of waterproofing seals and technological errors during the construction of the support rings. This research represents the first step towards a comprehensive understanding of the causes of water manifestations and the development of comprehensive solutions for addressing them.
引用
下载
收藏
页码:4357 / 4380
页数:24
相关论文
共 50 条
  • [41] Specific features of transport tunnel lining performance during construction and operation
    Vlassov, SN
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 593 - 595
  • [42] Concrete lining construction for tailwater tunnel
    Ren Min Chang Jiang, 4 (13-14, 22):
  • [43] Analysis of influence of undercrossing subway shield tunneling construction on the overlying tunnel
    Fang, Yong
    He, Chuan
    Tiedao Xuebao/Journal of the China Railway Society, 2007, 29 (02): : 83 - 88
  • [44] Investigation of cracking mechanism of the first tunnel lining during double-arch tunnel construction
    Sui, Yi
    Cheng, Xiaohui
    Zhao, Zuozhou
    Ma, Weibin
    UNDERGROUND SPACE, 2024, 14 : 1 - 17
  • [45] Strain analysis of tunnel lining during construction based on self-sensing monitoring technology of FRP
    Guo Dong
    Wei Qiang
    Li Jin-hui
    Huang Zheng-kai
    Bai Shi
    Jia Da-peng
    Qian Lin-feng
    Ou Jin-ping
    ROCK AND SOIL MECHANICS, 2022, 43 (12) : 3503 - 3512
  • [46] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [47] Grouting effect on the settlement of subway tunnel construction
    Wang, Xiao-Wei
    Liu, Tao
    Wang, Er-Jue
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 402 - 405
  • [48] Forensic Investigation of A Subway Tunnel Construction Failure
    Lee, W. F.
    Wang, C. C.
    Ishihara, K.
    Hwang, R. N.
    GEOTECHNICAL ENGINEERING, 2016, 47 (02): : 50 - 59
  • [49] Post-construction monitoring and analysis for highway tunnel lining cracks
    Ye, Fei
    He, Chuan
    Xia, Yongxu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (07): : 97 - 104
  • [50] Model analysis of pre-lining methods used in tunnel construction
    Vrba, V.
    Bartak, J.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 761 - +