共 50 条
- [41] Specific features of transport tunnel lining performance during construction and operation TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 593 - 595
- [43] Analysis of influence of undercrossing subway shield tunneling construction on the overlying tunnel Tiedao Xuebao/Journal of the China Railway Society, 2007, 29 (02): : 83 - 88
- [47] Grouting effect on the settlement of subway tunnel construction Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 402 - 405
- [48] Forensic Investigation of A Subway Tunnel Construction Failure GEOTECHNICAL ENGINEERING, 2016, 47 (02): : 50 - 59
- [49] Post-construction monitoring and analysis for highway tunnel lining cracks Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (07): : 97 - 104
- [50] Model analysis of pre-lining methods used in tunnel construction UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 761 - +