LOCOMOTIVE CRASH ENERGY MANAGEMENT TRAIN-TO-TRAIN IMPACT TEST RESULTS

被引:0
|
作者
Llana, Patricia [1 ]
Jacobsen, Karina [1 ]
Stringfellow, Richard [2 ]
机构
[1] Volpe Natl Transportat Syst Ctr, US Dept Transportat, Cambridge, MA 02142 USA
[2] CAMX Power LLC, Lexington, MA 02421 USA
关键词
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Research to develop new technologies for increasing the safety of passengers and crew in rail equipment is being directed by the Federal Railroad Administration's (FRA's) Office of Research, Data, and Innovation (RD&I). Two crash energy management (CEM) components that can be integrated into the end structure of a locomotive have been developed: a push-back coupler (PBC) and a deformable anti-climber (DAC). These components are designed to work in unison to inhibit override in the event of a collision. The results of vehicle-to-vehicle override, where the strong underframe of one vehicle, typically a locomotive, impacts the weaker superstructure of another vehicle, can be devastating and compromise the occupied space. These CEM components are specifically designed to mitigate the effects of a collision and to prevent override of one of the lead vehicles onto the other. They are designed to improve the crashworthiness of equipped locomotives in a wide range of potential collisions, including collisions with conventional locomotives, conventional cab cars, and freight equipment. In prior research, designs for the two CEM components for retrofit onto the forward end of a locomotive, a DAC and a PBC, were developed, fabricated, and tested. The tests were successful in demonstrating the effectiveness of the two CEM components. In a follow-on program, the two CEM components were integrated into the end structure of a conventional locomotive to demonstrate, through a series of full-scale vehicle collision tests, that these components work together to mitigate the effects of a collision and prevent override. This arrangement of tests allows for evaluation of the CEM-equipped locomotive performance, as well as comparison of measured with simulated locomotive performance in coupling, vehicle-to-vehicle, and train-to-train tests. In the first series of tests, both conventional and CEM coupling tests were conducted. The conventional coupling tests were conducted to establish the speed at which coupling does not cause damage to either of the colliding vehicles. The CEM coupling tests evaluated the performance of the PBC at collision speeds ranging from 2 mph to 9 mph. This test series allowed a performance comparison of a conventional locomotive with a CEM-equipped locomotive during coupling, as well as confirmation that the PBC triggers at a speed well above typical coupling speeds and at the designed force level. The second series of tests comprised two vehicle-to-vehicle collision tests. In Vehicle-to-Vehicle Test #1 (V2VT1), a CEM locomotive impacted a standing conventional locomotive. In Vehicle-to-Vehicle Test #2 (V2VT2), a CEM locomotive impacted a standing consist led by an M1 cab car with trailing freight cars. The vehicle-to-vehicle tests were successful in demonstrating the effectiveness of the components of the CEM system working together as an integrated system to absorb impact energy and to prevent override in two different vehicle-to-vehicle collision scenarios. The computer simulations predicted the behavior of the equipment in both collision scenarios with high fidelity. This paper describes the results of the final test in the test program, the Train-to-Train Test (T2TT). In this test, a CEM locomotive-led consist impacted a standing conventional locomotive-led consist. The primary objective of the test was to demonstrate the effectiveness of the CEM system in a consist, including managing load path, and inhibiting override and lateral buckling. Preparation for this test involved extensive computer simulations, repair of the CEM systems used in previous impact tests, and coordination of numerous research engineers, instrumentation engineers, and test engineers. The target impact speed was 21 mph. The actual speed of the test was 24.3 mph. The CEM system worked exactly as designed, successfully absorbing energy, keeping the vehicles in-line and the impact ends engaged, with no derailment and no signs of override. All test objectives were met, and test results compared favorably with pre-test analysis predictions as well as with post-test analyses run at the actual test speed. Equipment damage is described, and test results are provided and evaluated.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] A Study on Management of Waste Energy from Electric Train
    Lee, Hanmin
    2013 INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS (ICEMS), 2013, : 378 - 380
  • [32] Optimization of energy-absorbing parameters for train crash energy management using a variable-fidelity neural network surrogate model
    He, Jiaxing
    Xu, Ping
    Xing, Jie
    Yao, Shuguang
    Wang, Bo
    Zheng, Xin
    ENGINEERING STRUCTURES, 2025, 334
  • [33] Optimal energy management of a hybrid train Focus on saving braking energy
    Lanneluc, Charley
    Pouget, Julien
    Poline, Marie
    Chauvet, Frederic
    Gerbaud, Laurent
    2017 IEEE VEHICLE POWER AND PROPULSION CONFERENCE (VPPC), 2017,
  • [34] Potential of a fully mechanical valve train - Results of the simulation an the test bench
    Kairies, D
    Volpert, B
    Mohr, M
    Gollasch, D
    Flierl, R
    INNOVATIVE POWER TRAIN SYSTEMS, 2004, 1852 : 75 - 89
  • [36] Potential of a fully mechanical valve train: Results of the simulation an the test bench
    Kairies, Dirk
    Volpert, Bastian
    Mohr, Mark
    Gollasch, Daniel
    Flierl, Rudolf
    VDI Berichte, 2004, (1852): : 75 - 89
  • [37] An Application of Incremental Running Test Results to Train Professional Soccer Players
    Radziminski, Lukasz
    Rompa, Pawel
    Dargiewicz, Robert
    Ignatiuk, Wojciech
    Jastrzebski, Zbigniew
    BALTIC JOURNAL OF HEALTH AND PHYSICAL ACTIVITY, 2010, 2 (01) : 66 - 73
  • [38] Locomotives Energy Management with Inter-Vehicle Train Couplers
    George, Nevin
    Chowdhury, S. P. Daniel
    2018 IEEE PES/IAS POWERAFRICA CONFERENCE, 2018, : 895 - 900
  • [39] Energy Management System Design for Hybrid and Intelligent Light Train
    Pamuji, Feby Agung
    Dhiaulhaq, Muhammad Zufar
    Wibowo, Rony Seto
    Faurahmansyah, Mohamad Angga
    Suwito
    Iskandar, Eka
    Effendi, Mohammad Khoirul
    Sudarmanta, Bambang
    Syafi'i, Brilliant Alfan
    Arumsari, Nurvita
    Fauzun
    PRZEGLAD ELEKTROTECHNICZNY, 2023, 99 (08): : 80 - 86
  • [40] Seikan tunnel electric train propulsion - Regenerative energy management
    Isshiki, S
    Wyczalek, FA
    IECEC-97 - PROCEEDINGS OF THE THIRTY-SECOND INTERSOCIETY ENERGY CONVERSION ENGINEERING CONFERENCE, VOLS 1-4: VOL.1: AEROSPACE POWER SYSTEMS AND TECHNOL; VOL 2: ELECTROCHEMICAL TECHNOL, CONVERSION TECHNOL, THERMAL MANAGEMENT; VOLS 3: ENERGY SYSTEMS, RENEWABLE ENERGY RESOURCES, ENVIRONMENTAL IMPACT, POLICY IMPACTS ON ENERGY; VOL 4: POST DEADLINE PAPERS, INDEX, 1997, : 1662 - 1666