Value of long-term inflow forecast for hydropower operation: A case study in a low forecast precision region

被引:2
|
作者
Shu, Xingsheng [1 ]
Ding, Wei [1 ]
Peng, Yong [1 ]
Wang, Ziru [1 ]
机构
[1] Dalian Univ Technol, Sch Hydraul Engn, Dalian 116023, Liaoning, Peoples R China
基金
中国国家自然科学基金;
关键词
Forecast error; Hydropower benefits; Low accuracy; Influence mechanism; OPTIMIZATION MODEL; RESERVOIR; ALGORITHM; RULES;
D O I
10.1016/j.energy.2024.131218
中图分类号
O414.1 [热力学];
学科分类号
摘要
Many studies have evaluated the value of long-term inflow forecast for hydropower operation in high-precision watersheds and explored the impact of forecast uncertainty on hydropower benefits. However, few of them focuses on the low-accuracy regions and the specific impact of forecast errors on hydropower benefits. Taking Hunjiang cascaded system in China as an example, this study investigated the value of low accuracy long-term inflow forecast for hydropower operation, revealed the influence mechanism of forecast errors on hydropower benefits, and determined the critical threshold for accuracy of beneficial forecast. Results show that low accuracy forecast but higher than critical threshold can increase hydropower generation. Hunjiang has a low accuracy long-term forecast with qualified rate being 30-40 %, but annual hydropower generation can be increased by 14.86-29.58 million kWh. The influence mechanism of forecast errors on hydropower operation presents three typical scenarios, two of which are harmless. One is that the error tolerance of operation rules can avoid some decision-making errors; the other one is that when current misreporting is consistent with the inflow in a longer lead time, the misreporting may instead be beneficial. We conclude that low accuracy long-term forecast is valuable but higher accuracy brings higher benefits.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] A Novel Long Term Traffic Forecast Algorithm and Case Study for China
    Zhang Dongchen
    Wang Shoufeng
    Xu Xiaoyan
    Li Xingzheng
    Yao Wenwen
    Wang Tinglan
    2014 28TH INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION NETWORKING AND APPLICATIONS WORKSHOPS (WAINA), 2014, : 425 - 430
  • [32] Long-term container throughput forecast and equipment planning: the case of Bangkok Port
    Gosasang, Veerachai
    Yip, Tsz Leung
    Chandraprakaikul, Watcharavee
    MARITIME BUSINESS REVIEW, 2018, 3 (01) : 53 - 69
  • [33] Medium and Long-Term Economic Growth Forecast of China
    Jian, Zhao
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2320 - 2324
  • [34] Research on long-term runoff forecast of Danjiangkou reservoir
    Lu, Huayou
    Shao, Dongguo
    Guo, Yuanyu
    Wuhan Shuili Dianli Daxue Xuebao/Journal of Wuhan University of Hydraulic and Electric Engineering, 1996, 29 (06): : 6 - 10
  • [35] LONG-TERM FORECAST AND STRATEGY - FRENCH - DUPONT,C
    VARIN, P
    ANALYSE ET PREVISION, 1971, 12 (05): : 1380 - 1381
  • [36] EXPERIENCE OF MODEL USAGE IN LONG-TERM ECONOMIC FORECAST
    ARAKELYA.AA
    DADAYAN, VS
    VESTNIK AKADEMII NAUK SSSR, 1973, (02) : 58 - 64
  • [37] A Long-Term Forecast Analysis On Worldwide Land Uses
    Wenjun Zhang
    Yanhong Qi
    Zhiguo Zhang
    Environmental Monitoring and Assessment, 2006, 119 : 609 - 620
  • [38] Budget of sediments and forecast of long-term coastal changes
    I. O. Leont’yev
    Oceanology, 2008, 48 : 428 - 437
  • [39] Long-term forecast for childhood and juvenile absence epilepsy
    Isnard, Herve
    EPILEPSIES, 2007, 19 (02): : 131 - 131
  • [40] Long-term Forecast of the Demographic Transition in Japan and Asia
    Komine, Takao
    Kabe, Shigesaburo
    ASIAN ECONOMIC POLICY REVIEW, 2009, 4 (01) : 19 - 38