SAFETY EVALUATION TECHNIQUE OF ANNULAR PRESSURE IN OFFSHORE HIGH-TEMPERATURE HIGH-PRESSURE GAS WELLS

被引:0
|
作者
Li, Yanjun [1 ,2 ]
Liu, Shujie [1 ]
Gao, Deli [1 ]
Zhang, Zhi [3 ]
Long, Yang [1 ]
机构
[1] China Univ Petr, Beijing, Peoples R China
[2] CNOOC Ltd, Zhanjiang Branch, Zhanjiang, Peoples R China
[3] Southwest Petr Univ, Chengdu, Peoples R China
关键词
high-temperature high-pressure; annular pressure; wellbore integrity; drilling engineering;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The high- temperature high- pressure (HTHP) nature gas reserves in the South China Sea are 15 trillion cubic meters, accounting for approximately one-third of the total oil and gas resources in the South China Sea. There are many leak risk points of the HTHP wellbore, so it is very difficult to guarantee the wellbore integrity, and the annular pressure seriously threatens the test and construction security. Based on the safety assessment technology study of the annular pressure offshore HTHP gas fields, this paper designed the whole-life-cycle annular pressure management model and operation measures, developed the risk assessment technology of wellbore integrity, compiled the annular pressure diagnosis model, developed the calculation software of annular pressure critical control value, etc. And then, the critical control value of wellbore pressure can be calculated much more quickly and accurately for different production time, which could better manage the wellbore pressure risk and ensure the wellbore integrity. The safety assessment technology study result in the paper has been applied successfully in Yingqiong (YQ) Basin and achieved "zero" annular pressure during the on-site drilling, completion, and production operations.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] High-pressure/high-temperature seals for oil and gas production
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (06): : 86 - 87
  • [22] A new safety assessment method for liner hanger in ultra deep, high-temperature and high-pressure wells
    Xie, Bin
    Chen, Chaofeng
    Ma, Dudu
    Lian, Zhanghua
    Shi, Junlin
    [J]. Natural Gas Industry, 2022, 42 (09): : 93 - 101
  • [23] High-pressure/high-temperature challenges
    Payne, Mike
    [J]. JPT, Journal of Petroleum Technology, 2015, 67 (04):
  • [24] High-pressure/high-temperature challenges
    Payne, Mike
    [J]. JPT, Journal of Petroleum Technology, 2014, 66 (04):
  • [25] High-pressure/high-temperature cementing
    Bybee, Karen
    [J]. 1600, Society of Petroleum Engineers (SPE) (54):
  • [26] High-pressure/high-temperature challenges
    MacAndrew, R
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (03): : 54 - 54
  • [27] High-pressure/high-temperature challenges
    Payne, Mike
    [J]. JPT, Journal of Petroleum Technology, 2012, 64 (04):
  • [28] High-pressure/high-temperature cementing
    Bybee, K
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (08): : 58 - +
  • [29] High-pressure/high-temperature challenges
    [J]. Ziegler, Robert, 1600, Society of Petroleum Engineers (SPE) (69):
  • [30] HIGH-PRESSURE AND HIGH-TEMPERATURE DILATOMETER
    IDE, T
    TAKI, S
    TAKEMURA, T
    [J]. JAPANESE JOURNAL OF APPLIED PHYSICS, 1977, 16 (04) : 647 - 648