Techno-economic assessment of grid-connected residential photovoltaic systems considering overvoltage-induced generation curtailment

被引:1
|
作者
Jamroen, Chaowanan [1 ,2 ]
Vongkoon, Pokkrong [1 ]
Ma, Tao [3 ]
机构
[1] King Mongkuts Univ Technol North Bangkok, Fac Engn & Technol, Div Instrumentat & Automation Engn Technol, Bangkok 10800, Thailand
[2] King Mongkuts Univ Technol North Bangkok, Plasma & Automatic Elect Technol Res Grp, Rayong Campus, Rayong 21120, Thailand
[3] Shanghai Jiao Tong Univ, Engn Res Ctr Solar Energy & Refrigerat MOE, Sch Mech Engn, Shanghai 200240, Peoples R China
关键词
Curtailment; Grid-connected; Optimal sizing; Overvoltage; Photovoltaic; Techno-economic; SELF-CONSUMPTION; ADOPTION;
D O I
10.1016/j.egyr.2024.04.063
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Grid-connected residential photovoltaic (PV) systems are continuously installed in worldwide communities, predominantly to reduce electricity bills. However, the rapid growth of distributed PV systems inevitably causes overvoltage in distribution networks. Conventionally, PV curtailment is implemented in a grid-connected inverter to prevent the system from overvoltage. Nevertheless, previous studies have failed to consider PV curtailment caused by overvoltage when conducting techno-economic assessments. Therefore, this study conducts a comprehensive techno-economic assessment of grid-connected residential PV systems, considering overvoltage-induced generation curtailment. A volt-watt curtailment strategy is designed based on a droop characteristic. Simulation studies are conducted using real-world load profiles and electricity tariffs retrieved from the Metropolitan Electricity Authority in Thailand. Furthermore, a typical low-voltage distribution feeder in Bangkok, Thailand, is employed using Thailand's grid code. Simulation results indicate that the optimal PV size could be reduced by up to 58.33% (depending on the numbers and locations of PV systems) when considering overvoltage-induced generation curtailment, resulting in a profitability reduction of 21.34%. It is concluded that considering overvoltage-induced generation curtailment can accurately determine the PV size, preventing oversizing and overvoltage.
引用
收藏
页码:5059 / 5068
页数:10
相关论文
共 50 条
  • [41] Present status of photovoltaic energy in Turkey and life cycle techno-economic analysis of a grid-connected photovoltaic-house
    Celik, Ali Naci
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2006, 10 (04): : 370 - 387
  • [42] Techno-economic optimization of a grid-connected hybrid energy system considering electric and thermal load prediction
    Qiu, Ting
    Faraji, Jamal
    [J]. ENERGY SCIENCE & ENGINEERING, 2021, 9 (09) : 1313 - 1336
  • [43] Photovoltaic Power Generation in Indian Prospective Considering Off-grid and Grid-Connected Systems
    Kumar, Ajay
    Patel, Nirav
    Gupta, Nitin
    Gupta, Vikas
    [J]. INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2018, 8 (04): : 1936 - 1950
  • [44] Techno-economic assessment of a central grid-connected wind farm in Ghana using RETScreen? Expert
    Asamoah, Samuel Sarpong
    Parbey, Joseph
    Yankey, Isaac Kwasi
    Awuah, Alfred
    [J]. HELIYON, 2023, 9 (01)
  • [45] Techno-economic feasibility of photovoltaic, wind and hybrid electrification systems for stand-alone and grid-connected shipyard electrification in Italy
    Vakili, Seyedvahid
    Schonborn, Alessandro
    Olcer, Aykut, I
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 366
  • [46] Photovoltaic power generation in Indian prospective considering off-grid and grid-connected systems
    [J]. Kumar, Ajay (2016ree9055@mnit.ac.in), 1936, International Journal of Renewable Energy Research (08):
  • [47] Revisiting the techno-economic analysis process for building-mounted, grid-connected solar photovoltaic systems: Part two - Application
    Sommerfeldt, Nelson
    Madani, Hatef
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 74 : 1394 - 1404
  • [48] Techno-Economic Optimization of Grid-Connected Photovoltaic (PV) and Battery Systems Based on Maximum Demand Reduction (MDRed) Modelling in Malaysia
    Subramani, Gopinath
    Ramachandaramurthy, Vigna K.
    Sanjeevikumar, P.
    Holm-Nielsen, Jens Bo
    Blaabjerg, Frede
    Zbigniew, Leonowicz
    Kostyla, Pawel
    [J]. ENERGIES, 2019, 12 (18)
  • [49] Revisiting the techno-economic analysis process for building-mounted, grid-connected solar photovoltaic systems: Part one - Review
    Sommerfeldt, Nelson
    Madani, Hatef
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 74 : 1379 - 1393
  • [50] Techno-economic and environmental assessment of the coordinated operation of regional grid-connected energy hubs considering high penetration of wind power
    Oskouei, Morteza Zare
    Mohammadi-Ivatloo, Behnam
    Abapour, Mehdi
    Shafiee, Mahmood
    Anvari-Moghaddam, Amjad
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 280