Selection and Layout Optimization of Double Tower Cranes

被引:1
|
作者
Fu, Yan [1 ]
Bu, Jiarui [1 ]
Lin, Jingjun [2 ]
Liu, Jun [3 ]
Zhang, Chunli [4 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400045, Peoples R China
[2] CCCC Urban Investment Holding Co Ltd, Guangzhou 510000, Peoples R China
[3] China Construct Second Engn Bur Ltd, Beijing, Peoples R China
[4] Chongqing Jianzhu Coll, Chongqing 400072, Peoples R China
关键词
tower crane; selection; layout; positioning optimization; value engineering; LOCATION; ALGORITHM; MODEL;
D O I
10.3390/buildings14061705
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the scale of construction expanded and the number of prefabricated buildings increased, a single tower crane could no longer meet the construction requirements, necessitating the simultaneous operation of more tower cranes to improve construction efficiency. To optimize the efficiency and cost of lifting prefabricated concrete components and address the selection and layout optimization of dual tower cranes, this paper proposed a double tower crane selection and positioning optimization model that integrated feasible layout area solving and optimization based on different objectives. By analyzing the mathematical relationship between the layout positions of the tower cranes and the positions of the prefabricated component storage yard and installation sites, a mathematical model for the feasible layout area of double tower cranes was established and solved using a genetic algorithm. On this basis, optimization models were established with the objectives of minimizing cost, achieving the shortest total lifting time, and achieving the maximum value coefficient, and they were solved using a genetic algorithm. The model was verified and analyzed through a case study. The research results indicated that the double tower crane selection scheme could achieve more than twice the lifting efficiency of the same model single tower crane. When the total lifting time was similar, choosing based on the principles of value engineering could yield the optimal solution with lower costs. These research findings provided a reference for the selection of tower crane schemes and the cost reduction and efficiency improvement of on-site prefabricated concrete component lifting construction.
引用
收藏
页数:28
相关论文
共 50 条
  • [41] Weld Integrity Critical to Tower Cranes
    Trommer, Gerd
    WELDING JOURNAL, 2010, 89 (04) : 50 - 51
  • [42] OPTIMIZATION OF TORSIONAL STIFFNESS FOR OPERATIONAL EASINESS OF LARGE TOWER CRANES BY MINIMIZING VIBRATION GAINS
    Takahashi, Hideki
    Tsukahara, Fumiya
    Terauchi, Kenichi
    Sasai, Shintaro
    Sakurai, Hitoshi
    Okubo, Masaki
    Uchiyama, Naoki
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2023, 19 (03): : 699 - 719
  • [43] Tower cranes of the 'Strojmash' production association
    Tkachenko, A.A.
    Stroitel'nye i Dorozhnye Mashiny, 1993, (01):
  • [44] Optimization-Based Multipoint Trajectory Planning Along Straight Lines for Tower Cranes
    Burkhardt, Mark
    Gienger, Andreas
    Sawodny, Oliver
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2024, 32 (01) : 290 - 297
  • [45] Lifting Sequence Optimization of Luffing Tower Cranes Considering Motion Paths with Dynamic Programming
    Wu, Keyi
    Garcia de Soto, Borja
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (10)
  • [46] Multi-Objective Optimization of Tasks Scheduling Problem for Overlapping Multiple Tower Cranes
    Wang, Yanyan
    Zhao, Wenjie
    Cui, Wenjing
    Zhou, Guangqiang
    BUILDINGS, 2024, 14 (04)
  • [47] Motion planning approach for payload swing reduction in tower cranes with double-pendulum effect
    Ouyang, Huimin
    Tian, Zheng
    Yu, Lili
    Zhang, Guangming
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2020, 357 (13): : 8299 - 8320
  • [48] Amplitude-saturated control of underactuated double-pendulum tower cranes: Design and experiments
    Huang, Peng
    Zhang, Zhongcai
    Gao, Yang
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2025, 228
  • [49] Service scheduling optimization for multiple tower cranes considering the interval time of the cross-tasks
    Yin, Jing
    Li, Jiahao
    Fang, Yifan
    Yang, Ahui
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2023, 20 (03) : 5993 - 6015
  • [50] Optimization Design of Transmission Tower Based on Intelligent Selection
    Chen, Junqi
    Cao, Shihao
    Xian, Qingjun
    2018 5TH INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS, MECHANICS AND STRUCTURAL ENGINEERING (AMMSE), 2019, 473