共 50 条
- [43] Monitoring of the main parameters of a tunnel boring machine for the control of settlements during excavation in an urban area GEOTECHNICAL ENGINEERING IN THE XXI CENTURY: LESSONS LEARNED AND FUTURE CHALLENGES, 2019, : 1321 - 1329
- [47] TUNNEL CONNECTION OF 2 SHAFTS USING CONTINUOUS BORING MACHINES CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (691): : 1186 - &
- [48] DESIGN FEATURES OF THE MIXED GROUND SHIELD TUNNEL BORING MACHINES PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2019, 4 : 150 - 157
- [50] TUNNEL CONNECTION OF 2 SHAFTS USING CONTINUOUS BORING MACHINES CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (683): : 217 - &