Feasibility of the tower crane jib made of composite material

被引:0
|
作者
Solazzi, L. [1 ]
机构
[1] Univ Brescia, Dept Mech & Ind Engn, Via Branze 38, I-25123 Brescia, Italy
关键词
D O I
10.1088/1757-899X/1306/1/012010
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The main purpose of this research is to design a jib of a tower crane using composite material and to compare the effects/performance on the whole machine due to this lightweight process. The research starts by sizing the jib with steel material. Many different load conditions were involved and different criteria were assumed; those are: stress safety factor, stiffness, dynamic performance (modal) and buckling phenomenon which is the most important parameter. Then other non-standard load conditions were applied to the tower crane: moving load and jib (rotation and elevating) and adopting wind variable in time. The results of these load conditions were assumed to design a new jib made of pultruded composite material. The next step involves the design of additional elements of the crane: ropes, counter boom, counterweight, electric motor, etc. The last step concerns the economic feasibility of the new solution. The results show that the weight of the jib made by composite material is about 25% of the one made by steel and the economic payout for making the composite arm can be equalized in about a year and a half of machine operation, making the proposed solution very worthwhile.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Structural optimization research on superstructure of jib crane
    Shu Li
    Chun-Feng Wan
    Zhixiang Hou
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2017, 39 : 2779 - 2787
  • [32] Transport control of a jib crane with a rotating cargo
    Kodani N.
    Ouchi S.
    Takahashi K.
    Hirata H.
    Kodani, Nariyuki (kodanin@keyaki.cc.u-tokai.ac.jp), 1600, Institute of Electrical Engineers of Japan (136): : 821 - 831
  • [33] Jib crane can shorten refueling outages
    不详
    POWER, 2000, 144 (04) : 25 - 26
  • [34] Dynamic analysis and control of jib crane in case of jib luffing motion using modelling and simulations
    Doci, Ilir
    Hamidi, Beqir
    Lajqi, Shpetim
    IFAC PAPERSONLINE, 2016, 49 (29): : 163 - 168
  • [35] Research on Jib Performance of Crane in Hoisting Wind Generator
    Lin-jiang Zhao
    Yi-xiao Qin
    Li Zhang
    Journal of Failure Analysis and Prevention, 2020, 20 : 1794 - 1802
  • [36] LINK MARK III PORTABLE HYDRAULIC JIB CRANE
    不详
    MACHINERY AND PRODUCTION ENGINEERING, 1975, 126 (3249): : 249 - 249
  • [37] Aerial Multi-Camera Robotic Jib Crane
    Moreno, Patricio
    Presenza, Juan F.
    Mas, Ignacio
    Giribet, Juan, I
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2021, 6 (02) : 4104 - 4109
  • [38] Cause analysis of a fracture of the portal crane main jib
    Mi, Weijian
    Ma, Jie
    Zhao, Cheng
    Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement & Diagnosis, 19 (01): : 54 - 57
  • [39] OPTIMUM SYNTHESIS OF BALANCING MECHANISM OF THE JIB OF A MANIPULATOR CRANE
    KUZNETSOV, VM
    SOVIET ENGINEERING RESEARCH, 1983, 3 (02): : 39 - 41
  • [40] Research on Jib Performance of Crane in Hoisting Wind Generator
    Zhao, Lin-jiang
    Qin, Yi-xiao
    Zhang, Li
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2020, 20 (05) : 1794 - 1802