City-scale roof-top photovoltaic deployment planning

被引:3
|
作者
Wei, Tianxi [1 ]
Zhang, Yi [1 ]
Zhang, Yuhang [1 ]
Miao, Rui [1 ]
Kang, Jian [2 ]
Qi, He [3 ]
机构
[1] Inst Future Human Habitats, Tsinghua Shenzhen Int Grad Sch, Shenzhen, Guangdong, Peoples R China
[2] Bartlett Univ Coll London, Inst Environm Design & Engn, London WC1H 0NN, England
[3] China Construction Sci & Technol Grp Cooperat, 2007 Pingshan Ave, Shenzhen 518118, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
Roof -top PV; City -scale deployment planning; Decision making model; Typical urban unit cluster; Temporal mismatch; ENERGY-STORAGE; URBAN MORPHOLOGY; POWER-GENERATION; GRID INTEGRATION; SOLAR; FORM; SYSTEMS; AHP;
D O I
10.1016/j.apenergy.2024.123461
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Under the trends towards large-scale utilization of renewable energy in cities, Distributed Solar Photovoltaic (DSPV) systems installed on roof-tops are gradually attracting more attention as a solution for urban building renovations in China. For a mega city, strategically planning the deployment of numerous scattered DSPV systems is essential due to the long deployment cycle and complex decision-making factors involved. In this study, a city-scale PV deployment decision-making model is proposed. The K-medoid algorithm is used to conduct a multi-step urban unit clustering process based on morphology features. Six indicator categories, including initial PV condition, hourly matching degree, flexible resource dependency, installation scheme stability, deployment difficulty, and ground development potential, are evaluated to assess the deployment potential. The Analytic Hierarchy Process (AHP) and entropy method are employed to comprehensively rank all urban unit clusters and make pilot deployment decisions. A case study is conducted in Shenzhen, China, where 4687 urban units comprising 577,648 buildings are effectively clustered into 30 typical urban units. If the deployment targets of 20%, 40%, 60%, 80% and 100% are pursued, the distribution trend across the city shows the deployment direction from the urban units of more in the north and suburbs, near parks, and less in the high-density urban center. These deployment targets can respectively meet 4.1%, 8.39%, 12.08%, 16.39% and 20.06% of the city's electricity demand.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Realization of a Synthesized Compact Automotive Roof-top LTE Antenna
    Mahler, Tobias
    Kowalewski, Jerzy
    Reichardt, Lars
    Zwick, Thomas
    2013 IEEE ANTENNAS AND PROPAGATION SOCIETY INTERNATIONAL SYMPOSIUM (APSURSI), 2013, : 2073 - 2074
  • [32] A Novel Train Roof-Top Wind Energy Conversion System
    Kebede, Asegid Belay
    Worku, Getachew Biru
    Maru, Abrham Tibeb
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2022, 61 : 165 - 194
  • [33] Improving the energy production of roof-top solar PV systems through roof design
    Li, Hong Xian
    Zhang, Yitao
    Edwards, David
    Hosseini, M. Reza
    BUILDING SIMULATION, 2020, 13 (02) : 475 - 487
  • [34] Advancements and Challenges in Roof-Top Harvested Rainwater Filtration: A Review
    Gupta, Sakshi
    Mishra, Prabhash Kumar
    Khare, Deepak
    ENVIRONMENTAL PROCESSES-AN INTERNATIONAL JOURNAL, 2025, 12 (01):
  • [35] Roof-top selection by Least Terns in Pinellas County, Florida
    Forys, Elizabeth A.
    Borboen-Abrams, Monique
    WATERBIRDS, 2006, 29 (04) : 501 - 506
  • [36] Comparative Economic Analysis of Bifacial Roof-top PV Systems
    Sahu, Preeti Kumari
    Chakraborty, Chandan
    Roy, J. N.
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2024, 83
  • [37] Sustainable roof-top extension: a pilot project in Florence (Italy)
    Di Giulio, Roberto
    PORTUGAL SB10: SUSTAINABLE BUILDING AFFORDABLE TO ALL - LOW COST SUSTAINABLE SOLUTION, 2010, : 255 - 263
  • [38] Modeling of photovoltaic power generation and electric vehicles charging on city-scale: A review
    Shepero, Mahmoud
    Munkhammar, Joakim
    Widen, Joakim
    Bishop, Justin D. K.
    Bostrom, Tobias
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 89 : 61 - 71
  • [39] Insurmountable limitations of city-scale digital twins? On urban knowledge and planning
    Stefano Moroni
    Computational Urban Science, 5 (1):
  • [40] Temporal city-scale matching of solar photovoltaic generation and electric vehicle charging
    Fretzen, Ulrich
    Ansarin, Mohammad
    Brandt, Tobias
    APPLIED ENERGY, 2021, 282 (282)