A hybrid decision support framework for planning a risk-based audit engagement

被引:0
|
作者
Li, Yan [1 ,2 ]
Wang, Xiong [3 ,4 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Nanjing, Jiangsu, Peoples R China
[2] Nanjing Xiaozhuang Univ, Nanjing, Jiangsu, Peoples R China
[3] Celanese China Holding Co Ltd, Nanjing Branch, Nanjing, Jiangsu, Peoples R China
[4] Celanese China Holding Co Ltd, Internal Audit Dept Asia, Nanjing Branch, Nanjing, Jiangsu, Peoples R China
关键词
Audit engagement planning; risk analysis; resource allocation; best worst method; weighted multi-choice goal programming; CONSTRUCTION; SELECTION; DESIGN;
D O I
10.1080/01605682.2024.2368615
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Internal audit engagement planning is a fundamental component of internal audit activities, and a poor plan can impair the audit quality. However, studies on internal audit engagement planning have limited exposure in the literature. To the best of our knowledge, a comprehensive and robust model has not been established to address the decision-making problems associated with the audit engagement planning process. To fill these gaps, an integrated multi-stage framework is presented for developing a risk-based audit engagement plan. The designed framework includes three stages to carry out the decision procedure. First, a combined method of best worst method and weighted probability-impact score is used to evaluate the risk exposure. Second, risk assessment results are integrated into the weighted multi-choice goal programming (WMCGP) model for selecting the audit scope and allocating budgeted audit hours. Third, WMCGP model assigns audit staff to the selected audit scope to satisfy auditor preference and fitness. Two real-life case studies illustrate that the proposed framework is a useful tool for selecting the critical audit scope and deploying appropriate resources. The research results outperform the manual procedures, enabling the audit team to use constrained resources more effectively and efficiently.
引用
收藏
页码:498 / 513
页数:16
相关论文
共 50 条
  • [21] Toward a Risk-Based Framework for Land Use Reconstruction Planning
    Siembieda, William J.
    JOURNAL OF THE AMERICAN PLANNING ASSOCIATION, 2014, 80 (04) : 338 - 339
  • [22] A risk-based decision support system in local railways management
    Di Graziano, A.
    Marchetta, V
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2021, 20
  • [23] Risk-based decision support of water resource management alternatives
    West, Paul D.
    Trainor, Timothy
    WASTEWATER REUSED - RISK ASSESSMENT, DECISION-MAKING AND ENVIRONMENTAL SECURITY, 2007, : 145 - +
  • [24] A Framework for Risk-Based Cost-Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction
    Merisalu, Johanna
    Sundell, Jonas
    Rosen, Lars
    GEOSCIENCES, 2021, 11 (02) : 1 - 19
  • [25] A risk-based decision support framework for selection of appropriate safety measure system for underground coal mines
    Samantra, Chitrasen
    Datta, Saurav
    Mahapatra, Siba Sankar
    INTERNATIONAL JOURNAL OF INJURY CONTROL AND SAFETY PROMOTION, 2017, 24 (01) : 54 - 68
  • [26] Risk-Based AC/DC Hybrid Distribution System Planning
    Esmaeilzadeh, Z.
    Falaghi, H.
    Ramezani, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2024, 37 (05): : 876 - 886
  • [27] Risk-Based Project Management Audit
    Klimova, Julia
    INTEGRATED SCIENCE IN DIGITAL AGE, 2020, 78 : 39 - 49
  • [28] Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines
    Sorensen, John Dalsgaard
    WIND ENERGY, 2009, 12 (05) : 493 - 506
  • [29] A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING
    Bui, Lam T.
    Barlow, Michael
    Abbass, Hussein A.
    NEW MATHEMATICS AND NATURAL COMPUTATION, 2009, 5 (02) : 459 - 485
  • [30] Systemic model for decision support in selective risk-based maintenance scheduling
    Crestani, B.
    Le Dain, M-A
    Flaus, J-M
    2020 INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND DIAGNOSIS (ICCAD), 2020, : 157 - 162