共 30 条
- [24] Application of Fuzzy Comprehensive Evaluation Method Considering Risk Factors in Project Schedule Management [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 2976 - 2981
- [25] A Time Sequential Simulation Method for Making Electric Energy Monthly Trade Schedule Incorporating Multiple Energy Resources [J]. 2016 3RD INTERNATIONAL CONFERENCE ON SYSTEMS AND INFORMATICS (ICSAI), 2016, : 240 - 246
- [27] A Multi-User Schedule Method for Non-Orthogonal Multiple Access in 5G Heterogeneous Network [J]. Xibei Gongye Daxue Xuebao/Journal of Northwestern Polytechnical University, 2019, 37 (02): : 337 - 343
- [28] Example Application of Cost and Schedule Equilibrium Control Model in Communication Base Station Construction Project Based on Earned Value Method [J]. PROCEEDINGS OF THE 2017 9TH INTERNATIONAL ECONOMICS, MANAGEMENT AND EDUCATION TECHNOLOGY CONFERENCE (IEMETC 2017), 2017, 48 : 61 - 65
- [29] Designing Container Trucks Arrival Schedule Using Truck Turnaround Time Method at Terminal Peti Kemas Selatan PT. Pelabuhan Tanjung Priok [J]. RECENT PROGRESS ON: MECHANICAL, INFRASTRUCTURE AND INDUSTRIAL ENGINEERING, 2020, 2227
- [30] Comparison of disability and quality of life measures in patients with long-term psychotic disorders and patients with multiple sclerosis: an application of the WHO Disability Assessment Schedule II and WHO Quality of Life-BREF [J]. INTERNATIONAL JOURNAL OF REHABILITATION RESEARCH, 2008, 31 (02) : 141 - 149