Hybrid designs and kick-off batch production experience for the CMS Phase-2 Upgrade

被引:0
|
作者
Kovacs, M. [1 ]
Abbas, M. [1 ]
Ahmed, I. [1 ]
Blanchot, G. [1 ]
Honma, A. [1 ]
Rosa, A. La [1 ]
Dominguez, I. Mateos [1 ]
Klein, K. [3 ]
Najafabadi, M. Mohammadi [1 ]
Schleidweiler, K. [1 ]
Szydlik, P. [2 ]
Zografos, A. [1 ]
机构
[1] CERN, CH-1211 Geneva 23, Switzerland
[2] Wroclaw Univ Sci & Technol, 27 Wybrzeze Wyspianskiego St, PL-50370 Wroclaw, Poland
[3] Rhein Westfal TH RWTH Aachen, Templergraben 55, D-51056 Aachen, Germany
关键词
Data acquisition circuits; Front-end electronics for detector readout; Manufacturing; Radiation-hard electronics;
D O I
10.1088/1748-0221/19/04/C04052
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The CMS Tracker Phase -2 Upgrade requires the production of new sensor modules to cope with the requirements of the HL-LHC. The two main building blocks of the Outer Tracker are the Strip -Strip and Pixel -Strip modules. All -together 47'520 hybrid circuits will be produced to construct 8'000 Strip -Strip and 5'880 Pixel -Strip modules. The circuit designs for the mass production were fine-tuned and kick-off batches were manufactured to verify the latest changes in the designs before the series production. This contribution focuses on lessons learned from the prototyping stage, design optimization details for the mass production as well as test results and production yield from the kick-off batches.
引用
收藏
页数:9
相关论文
共 48 条
  • [1] Front-end hybrid designs for the CMS Phase-2 Upgrade towards the production phase
    Kovacs, M.
    Blanchot, G.
    Gadek, T.
    Hollos, A.
    Dominguez, I
    Zografos, A.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (04):
  • [2] Phase-2 Upgrade of the CMS Tracker
    Mersi, Stefano
    NUCLEAR AND PARTICLE PHYSICS PROCEEDINGS, 2016, 273 : 1034 - 1041
  • [3] The Phase-2 Upgrade of the CMS Outer Tracker
    Chowdhury, Suvankar Roy
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2020, 979
  • [4] The Phase-2 upgrade of the CMS outer tracker
    Nash, Kevin
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2024, 1058
  • [5] The Phase-2 Upgrade of the Hardware Trigger of CMS at the LHC
    Jeitler, M.
    JOURNAL OF INSTRUMENTATION, 2020, 15 (09):
  • [6] Software tools for hybrid quality control for the CMS Outer Tracker Phase-2 Upgrade
    Dominguez, I. Mateos
    Blanchot, G.
    Chatagnon, P.
    Cooperstein, S.
    Di Mattia, A.
    Honma, A.
    Klein, K.
    Kovacs, M.
    La Rosa, A.
    Makarenko, I.
    Otarid, Y.
    Pauls, A.
    Pissaki, Z.
    Schleidweiler, K.
    El Nasr, S. Seif
    Zografos, A.
    JOURNAL OF INSTRUMENTATION, 2023, 18 (01)
  • [7] Hybrids acceptance tools for the CMS Phase-2 Tracker Upgrade
    Hollos, A.
    Blanchot, G.
    Kovacs, M.
    Loutit, M.
    Makarenko, I
    Mateos, I
    Otarid, Y.
    El Nasr, S. Seif
    Zografos, A.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (06):
  • [8] Power, readout and service hybrids for the CMS phase-2 upgrade
    Zografos, A.
    Blanchot, G.
    Dominguez, I. M.
    Hollos, A. E.
    Kovacs, M., I
    Rasevic, N.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (03):
  • [9] CMS Outer Tracker Phase-2 Upgrade module noise and mitigation
    Zografos, A.
    Blanchot, G.
    Kovacs, M.
    Maier, S.
    Mateos, I.
    Pauls, A.
    Schleidweiler, K.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (12):
  • [10] Techniques for mass production of large-sized GEM foil by the Korean CMS group for CMS phase-2 upgrade
    Yoon, I.
    JOURNAL OF INSTRUMENTATION, 2023, 18 (06):