The dust pollution characteristic after tunnel blasting and related influence parameters by using experimental method

被引:4
|
作者
Zhang, Heng [1 ,2 ]
Zhao, Yiqi [1 ,2 ]
Zhang, Gang [2 ,3 ,5 ]
Tao, Yuchun [1 ,2 ]
Ge, Zhenghui [1 ,4 ]
机构
[1] Southwest Jiaotong Univ, Key Lab Transportat Tunnel Engn, Minist Educ, Chengdu 610031, Sichuan, Peoples R China
[2] Sichuan Vocat & Tech Coll Commun, Dept Rd & Bridge Engn, Chengdu 611130, Peoples R China
[3] China Merchants ChongQing Highway Engn Testing Ctr, Chongqing 400060, Peoples R China
[4] Sichuan Highway Planning Survey Design & Res Inst, Chengdu 610041, Sichuan, Peoples R China
[5] Southwest Jiaotong Univ, Sch Civil Engn, Key Lab Transportat Tunnel Engn, Minist Educ, Chengdu, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Double-track railway tunnel; Blasting construction; Dust transport; Model test; Influence parameter; VENTILATION SYSTEM;
D O I
10.1016/j.tust.2024.105752
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The advancement of extra-long tunnel building has led to a corresponding deepening of construction ventilation technology. However, dust pollution created by drilling and blasting construction has become one of the serious obstacles to improving the construction environment. This paper employs the model test as the primary research methodology to investigate the diffusion characteristics of heterogeneous dust groups with varying scales under the influence of the ventilation airflow field in the construction of the extra-long railway tunnel. First, an equal scale (1:21) model is built based on the standard section of the long double-track railway tunnel and the resemblance criterion. Second, the ventilation system and dust generator were assembled in accordance with the actual project, and the effects of different initial dust volume, return air rate, and second lining step on key characteristics such as dust peak concentration, diffusion rate, and dust suppression efficiency were discussed. The final research findings are intended to provide theoretical direction for dust suppression technologies in the construction of extra-long railway tunnels. The model test results demonstrate that when the initial dust concentration is greater than 150 mg/m3 during tunnel construction, it is rather difficult to discharge dust. Keeping the return air wind speed in the tunnel above 1 m/s can significantly reduce energy consumption while maintaining ventilation. When the trolley is positioned 90 m from the tunnel face, the lag impact on dust in the tunnel is apparent.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Calculation and practice of blasting parameters of electronic detonator in tunnel under the influence of multi-factor coupling
    Liu, Xiangyu
    Gong, Min
    Wu, Haojun
    An, Di
    Zhendong yu Chongji/Journal of Vibration and Shock, 2021, 40 (05): : 24 - 32
  • [22] Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure
    Huang, Haibin
    Li, Peng
    Wang, Chuang
    Yuan, Bingxiang
    Chen, Minjie
    Feng, Weimin
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [23] The Influence of Real Gas Effects and Thermochemical Reactions on the Characteristic Parameters of Flow in Shock Tunnel
    Huang, Chengyang
    Li, Xian
    Kong, Xiaoping
    Kong, Rongzong
    Luo, Shichao
    Hu, Shouchao
    Yuhang Xuebao/Journal of Astronautics, 2024, 45 (08): : 1301 - 1312
  • [24] Calculation Method of Parameters for Tunnel Blasting Circuit with Inside and Outside Blastholes Delay Based on Safe Initiation
    Wu X.
    Gong M.
    Wu H.
    Liu X.
    Hu G.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2022, 30 (02): : 471 - 485
  • [25] Influence of Soil Parameters on Detecting Voids behind a Tunnel Lining Using an Impact Echo Method
    Ma, Meng
    Cao, Rongning
    Niu, Chao
    Zhang, Hougui
    Liu, Weining
    APPLIED SCIENCES-BASEL, 2019, 9 (24):
  • [26] Optimization Method for Installation Timing of Secondary Lining in Mechanized Tunnel Construction Using Drilling and Blasting Method
    Chen, Zi-Quan
    Sun, Zhen-Yir
    Zhou, Zi-Han
    Li, Tian-Shcng
    Wang, Bo
    Xu, Guo-Wen
    Jiang, Chang-Wei
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (07): : 70 - 81
  • [27] Air pollutant removal performance using a BiLSTM-based demand-controlled ventilation method after tunnel blasting
    An, Farun
    Yang, Dong
    Wei, Haibin
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2024, 253
  • [28] Influence of Soft Rock Mechanics Parameters on Surrounding Rock Vibration during the Tunnel Blasting with Thin Bedrock Roof
    Deng E.
    Yang W.
    Zhang P.
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2019, 47 (08): : 23 - 30
  • [29] Diffusion Characteristics of Airflow and CO in the Dead-End Tunnel with Different Ventilation Parameters after Tunneling Blasting
    Wang, Jinmiao
    Xue, Yan
    Xiao, Jun
    Shi, Dongping
    ACS OMEGA, 2023, 8 (39): : 36269 - 36283
  • [30] Risk assessment and the damping measures of the tunnel transfixion section using drilling and blasting construction method
    You, Pengfei
    Mou, Ruifang
    GEOMECHANICS AND GEOTECHNICS: FROM MICRO TO MACRO, VOLS 1 AND 2, 2011, : 1141 - 1145