The dynamic multi project human resource allocation method of manufacturing industry based on multidimensional model

被引:0
|
作者
Zhou Y. [1 ]
机构
[1] Business College, Hunan International Economics University, Changsha
关键词
fuzzy sets; human resource allocation; multidimensional model; PCA interval model;
D O I
10.1504/IJMTM.2024.137384
中图分类号
学科分类号
摘要
In order to overcome the problems of low allocation accuracy and long allocation time, this paper designs a dynamic multi project human resource allocation method in manufacturing industry based on multidimensional model. First, the total number of talents, workload and utilisation efficiency are determined. Then, a fuzzy set of human resources indicators is built, and the different hierarchical weights of each indicator calculate are calculated. Finally, fuzzy comprehensive evaluation method is used to construct the index comprehensive evaluation matrix, the PCA interval model in the multi-dimensional model is used to orthogonalize each index, and the multilateral convex set model in the model is used to realise the intersection of index parameters in different regions, so as to realise the rational allocation of human resources. The experimental results show that the proposed method improves the accuracy of dynamic multi project human resources allocation in manufacturing industry, and the allocation time is short. Copyright © 2024 Inderscience Enterprises Ltd.
引用
收藏
页码:27 / 39
页数:12
相关论文
共 50 条
  • [41] Multi-beam satellite dynamic resource allocation method based on improved SA-NSGAI
    Rao, Yue
    Yang, Jian
    Sun, Guomin
    Zhang, Wei
    Shao, Huaizong
    Lin, Jingran
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2024, 46 (12): : 4222 - 4230
  • [42] Multi-resource allocation in stochastic project scheduling
    Wiesemann, Wolfram
    Kuhn, Daniel
    Rustem, Berc
    ANNALS OF OPERATIONS RESEARCH, 2012, 193 (01) : 193 - 220
  • [43] Multi-resource allocation in stochastic project scheduling
    Wolfram Wiesemann
    Daniel Kuhn
    Berç Rustem
    Annals of Operations Research, 2012, 193 : 193 - 220
  • [44] Classification of Human- and Automated Resource Allocation Approaches in Multi-Project Management
    Ponsteen, Albert
    Kusters, Rob J.
    PROCEEDINGS OF THE 2014 IPMA WORLD CONGRESS, 2015, 194 : 165 - 173
  • [45] A multidimensional resource model for dynamic resource matching in internet of things
    Zhao, Shuai
    Zhang, Yang
    Yu, Le
    Cheng, Bo
    Ji, Yang
    Chen, Junliang
    CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2015, 27 (08): : 1819 - 1843
  • [46] Construction Multi-Project Scheduling Model Considering Different Resource Allocation Behavior
    Liu, Shu-Shun
    Chen, Wei Tong
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2815 - +
  • [47] A Cloud Manufacturing Resource Allocation Model Based on Ant Colony Optimization Algorithm
    Wei, Xianmin
    Liu, Hong
    INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2015, 8 (01): : 55 - 66
  • [48] A Multidimensional Information Fusion-Based Matching Decision Method for Manufacturing Service Resource
    Xiao, Yan
    Li, Congdong
    Song, Lijun
    Yang, Jie
    Su, Jiafu
    IEEE ACCESS, 2021, 9 : 39839 - 39851
  • [49] Test of a serial mediated model of green human resource management in the manufacturing industry
    Nosrati, Saeid
    Talebzadeh, Niusha
    Maydon, Denitsa Hristoforova
    Karatepe, Osman M.
    CORPORATE SOCIAL RESPONSIBILITY AND ENVIRONMENTAL MANAGEMENT, 2025, 32 (02) : 2458 - 2471
  • [50] The Allocation Optimization of Project Human Resource Based on Particle Swarm Optimization Algorithm
    Wang, Shao-Qiang
    Gong, Li-Hua
    Yan, Shi-Liang
    2009 IITA INTERNATIONAL CONFERENCE ON SERVICES SCIENCE, MANAGEMENT AND ENGINEERING, PROCEEDINGS, 2009, : 169 - +