The dynamic multi project human resource allocation method of manufacturing industry based on multidimensional model

被引:0
|
作者
Zhou Y. [1 ]
机构
[1] Business College, Hunan International Economics University, Changsha
关键词
fuzzy sets; human resource allocation; multidimensional model; PCA interval model;
D O I
10.1504/IJMTM.2024.137384
中图分类号
学科分类号
摘要
In order to overcome the problems of low allocation accuracy and long allocation time, this paper designs a dynamic multi project human resource allocation method in manufacturing industry based on multidimensional model. First, the total number of talents, workload and utilisation efficiency are determined. Then, a fuzzy set of human resources indicators is built, and the different hierarchical weights of each indicator calculate are calculated. Finally, fuzzy comprehensive evaluation method is used to construct the index comprehensive evaluation matrix, the PCA interval model in the multi-dimensional model is used to orthogonalize each index, and the multilateral convex set model in the model is used to realise the intersection of index parameters in different regions, so as to realise the rational allocation of human resources. The experimental results show that the proposed method improves the accuracy of dynamic multi project human resources allocation in manufacturing industry, and the allocation time is short. Copyright © 2024 Inderscience Enterprises Ltd.
引用
收藏
页码:27 / 39
页数:12
相关论文
共 50 条
  • [1] Multi-dimensional Model Method for the Human Resource Allocation in Multi-project
    Chen Junjie
    Yun Chuxiu
    Wang Zhen
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 364 - +
  • [2] A dynamic model of resource allocation in multi-project research and development systems
    Repenning, NP
    SYSTEM DYNAMICS REVIEW, 2000, 16 (03) : 173 - 212
  • [3] A Model-Based Hybrid System for Human Resource Allocation in Multi-Project Management
    Khatun, Mst Taskia
    Hiekata, Kazuo
    TRANSDISCIPLINARITY AND THE FUTURE OF ENGINEERING, 2022, 28 : 586 - 595
  • [4] A simulation model for multi-project resource allocation
    Fatemi Ghomi, S.M.T.
    Ashjari, B.
    International Journal of Project Management, 2002, 20 (02) : 127 - 130
  • [5] Task allocation based on shared resource constraint for multi-robot systems in manufacturing industry
    Zaidi, L.
    Sahnoun, M.
    Bettayeb, B.
    IFAC PAPERSONLINE, 2019, 52 (13): : 2020 - 2025
  • [6] A Project Human Resource Allocation Method Based on Software Architecture and Social Network
    Zhou, Lixin
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7422 - 7427
  • [7] Agent-based negotiation mechanism for multi-project human resource allocation
    Chien, Ting-Hua
    Lin, Yung-I
    Tien, Kai-Wen
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2013, 30 (08) : 518 - 527
  • [8] Resource Allocation and Productivity of the Russian Manufacturing Industry
    Kaukin, Andrey S.
    Zhemkova, Alexandra M.
    EKONOMICHESKAYA POLITIKA, 2023, 18 (05): : 68 - 99
  • [9] A MULTI-OBJECTIVE ENERGY RESOURCE ALLOCATION MODEL FOR TURKISH MANUFACTURING INDUSTRY USING LINEAR PHYSICAL PROGRAMMING
    Onut, Semih
    Tuzkaya, Umut Rifat
    Tuzkaya, Gulfem
    Gulsun, Bahadir
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2011, 7 (06): : 3147 - 3169
  • [10] Dynamic Resource Allocation Using Multi-Agent Control for Manufacturing Systems
    Bi, Mingjie
    Kovalenko, Ilya
    Tilbury, Dawn M.
    Barton, Kira
    IFAC PAPERSONLINE, 2021, 54 (20): : 488 - 494