The Tauernmoos pumped-storage hydro power plant – Energy storage for the Austrian railway

被引:0
|
作者
Herzog P. [1 ]
Voringer J. [2 ]
Kühner W. [3 ]
Reiter F. [3 ]
Lang G. [4 ]
机构
[1] ÖBB Infrastruktur AG, Weiserstraße 7, Salzburg
[2] Swietelsky Tunnelbau GmbH und Co KG, Innsbrucker Bundesstraße 61, Salzburg
[3] ÖBB Infrastruktur AG, Claudiastraße 2, Innsbruck
[4] AFRY Austria GmbH, Strubergasse 30, Salzburg
来源
Geomechanik und Tunnelbau | 2022年 / 15卷 / 05期
关键词
cavern; headrace tunnel; Hydro power plants; intake structures; Pressure tunnels; pumped storage power station; traction power; ÖBB;
D O I
10.1002/geot.202200025
中图分类号
学科分类号
摘要
In 2004, ÖBB-Infrastruktur AG started the first studies for the construction of a pumped-storage hydro power plant between the two largest reservoirs of the existing Stubach Valley power plant group in Salzburg's Pinzgau region. Two reversible pump-turbine units including a full converter with a total capacity of 170 MW and a maximum flow of 80 m3/s are planned. The construction of the 335 million. euro project started in 2020 and will be completed by autumn 2025. In addition to a 50,000 m3 cavern, an 11.5 km tunnel system including the access tunnels and the power water ways have been built. Most of the 11.5 km tunnel system is situated in stable gneiss. A greater challenge is the construction of the two inlet and outlet structures in the high mountain region during the winter season, when the lakes can be held on the lowest reservoir level. Since the remaining construction work is also carried out at an altitude of 1500 to 2250 m above sea level in alpine terrain, the construction company has been facing recurring problems such as snow, cold, wind, mudslides and the associated logistical difficulties. Despite these challenges, the excavation work was completed in summer 2022. The main focus is currently placed on the concrete works in the cavern, which is scheduled to be completed in autumn 2023. This will be followed by the installation of mechanical and electrical equipment as well as the control systems. © 2022, Ernst und Sohn. All rights reserved.
引用
下载
收藏
页码:491 / 501
页数:10
相关论文
共 50 条
  • [11] Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer
    Jaramillo Duque, Alvaro
    Castronuovo, Edgardo D.
    Sanchez, Ismael
    Usaola, Julio
    ELECTRIC POWER SYSTEMS RESEARCH, 2011, 81 (09) : 1767 - 1777
  • [12] THE DRAKENSBERG PUMPED-STORAGE PLANT
    HIRT, K
    WIMMER, M
    BROWN BOVERI REVIEW, 1983, 70 (7-8): : 268 - 279
  • [13] TVAS PUMPED-STORAGE PLANT
    不详
    CIVIL ENGINEERING, 1980, 50 (06): : 84 - 87
  • [14] Current Condtion of the Pumped-Storage Power Plant in Germany
    Heimerl, Stephan
    Kohler, Beate
    WASSERWIRTSCHAFT, 2017, 107 (10) : 77 - 79
  • [15] Advances in the plant at hydroelectric and pumped-storage power stations
    Krasil'nikov M.F.
    Hydrotechnical Construction, 2000, 34 (8-9) : 390 - 397
  • [16] STATIC STARTER FOR PUMPED-STORAGE POWER-PLANT
    KATO, N
    HIOKI, T
    SAKAI, T
    NAKAMURA, T
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (04): : 1075 - 1075
  • [17] Studies for Nuclear and Pumped-Storage Power Plant Zarnowiec
    Majewski, Wojciech
    EXPERIMENTAL METHODS IN HYDRAULIC RESEARCH, 2011, : 113 - 122
  • [18] STATIC STARTER FOR PUMPED-STORAGE POWER PLANT.
    Kato, N.
    Hioki, T.
    Sakai, T.
    Nakamura, T.
    1977,
  • [19] Model and arithmetic for the planning of pumped-storage power plant
    Yang, J.Y.
    Fu, Z.K.
    2001, Chinese Society for Electrical Engineering (21): : 33 - 36
  • [20] Battery and Flywheel hybridization of a reversible Pumped-Storage Hydro Power Plant for wear and tear reduction
    Casarin, Stefano
    Cavazzini, Giovanna
    Perez-Diaz, Juan Ignacio
    JOURNAL OF ENERGY STORAGE, 2023, 71