Analysis of technical interface between Sichuan-Tibet railway bridge engineering and other engineering

被引:0
|
作者
Huang, Chengfeng [1 ]
Hu, Suoting [2 ]
Ban, Xinlin [2 ]
Bao, Xueying [1 ]
Wang, Lin [1 ]
Hong, Yanyan [1 ]
机构
[1] School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou,730070, China
[2] China Academy of Railway Sciences Corporation Limited, Beijing,100081, China
关键词
Compendex;
D O I
10.19713/j.cnki.43-1423/u.T20201018
中图分类号
学科分类号
摘要
Project management - Railroads - Fuzzy rules - Railroad transportation
引用
收藏
页码:2469 / 2479
相关论文
共 50 条
  • [41] Research on the Comprehensive Survey Technology of Sichuan-Tibet Railway Traffic Safety Corridor
    川藏铁路交通安全廊道综合勘察技术研究
    Huang, Yong, 1600, Editorial Department of Journal of Railway Engineering Society (37): : 16 - 21
  • [42] Continuous Flexible AC Traction Power Supply System in Sichuan-Tibet Railway
    Lin, Yunzhi
    Wei, Yingdong
    Li, Xiaoqian
    Li, Zengqin
    Journal of Railway Engineering Society, 2021, 38 (09) : 54 - 60
  • [43] Risk warning technologies and emergency response mechanisms in Sichuan-Tibet Railway construction
    Liujiang KANG
    Hao LI
    Cong LI
    Na XIAO
    Huijun SUN
    Nsabimana BUHIGIRO
    Frontiers of Engineering Management, 2021, (04) : 582 - 594
  • [44] Intelligent Perception of Coseismic Landslide Migration Areas Along Sichuan-Tibet Railway
    Shi, Wenyang
    Lu, Ping
    IEEE JOURNAL OF SELECTED TOPICS IN APPLIED EARTH OBSERVATIONS AND REMOTE SENSING, 2021, 14 : 8876 - 8883
  • [45] Formation Mechanism and Development Potential of Geothermal Resources along the Sichuan-Tibet Railway
    Wang X.
    Wang T.
    Gao N.
    Liu H.
    Mao X.
    Luo L.
    Wu C.
    Cui Z.
    Diqiu Kexue - Zhongguo Dizhi Daxue Xuebao/Earth Science - Journal of China University of Geosciences, 2022, 47 (03): : 995 - 1011
  • [46] Risk assessment of Sichuan-Tibet railway bridge construction based on dynamic weight—2-D cloud model
    Li, Haiwen
    Bao, Xueying
    Journal of Railway Science and Engineering, 2021, 18 (06) : 1650 - 1660
  • [47] Cause Analysis of Geothermal Water and Geological Route Selection Research on the Sangzhuling Tunnel of Sichuan-Tibet Railway
    He, Ping
    Zhang, Guangze
    Qiang, Xingang
    Journal of Railway Engineering Society, 2020, 37 (06) : 10 - 13
  • [48] A Geospatial Analysis-Based Method for Railway Route Selection in Marine Glaciers: A Case Study of the Sichuan-Tibet Railway Network
    Deng, Tao
    Sharafat, Abubakar
    Wie, Young Min
    Lee, Ki Gang
    Lee, Euiong
    Lee, Kang Hoon
    REMOTE SENSING, 2023, 15 (17)
  • [49] Study on Quality Management of Technical Interface Process of Railway Engineering
    Bao X.
    He Z.
    Ban X.
    Xu J.
    Tiedao Xuebao, 2023, 2 (165-174): : 165 - 174
  • [50] Forming Process and Mechanisms of Geo-Hazards in Luding Section of the Sichuan-Tibet Railway
    Wang Y.
    Cheng W.
    Liu J.
    Diqiu Kexue - Zhongguo Dizhi Daxue Xuebao/Earth Science - Journal of China University of Geosciences, 2022, 47 (03): : 950 - 958