Model-based trade-off curves to support the set-based concurrent engineering of highly innovative projects

被引:2
|
作者
Silvestre De Oliveira M. [1 ,2 ]
Fidelis Peixer G. [1 ,2 ]
Forcellini F.A. [2 ]
Riso Barbosa J., Jr. [1 ,2 ]
Lozano Cadena J.A. [1 ,2 ]
机构
[1] Polo - Research Laboratories for Emerging Technologies in Cooling and Thermophysics, Department of Mechanical Engineering, Federal University of Santa Catarina, Florianópolis
[2] Department of Mechanical Engineering, Federal University of Santa Catarina, Florianópolis
来源
关键词
computational simulation; innovation; lean product development; machine learning; mathematical modelling; set based concurrent engineering; trade-off curves;
D O I
10.1177/1063293X231209680
中图分类号
学科分类号
摘要
The literature acknowledges the advantages of Set-Based Concurrent Engineering (SBCE), but there is a lack of models for its adoption and documented cases of its implementation, mostly on products with consolidated technology, which raises the possibility of expanding SBCE for highly innovative products. These projects often have extensive resource limitations, leading to computational tools and mathematical modelling as fundamental sources of information. This paper proposes a method for model-based Trade-off Curves (ToC) generation to support SBCE. We adopted it to develop a magnetic air conditioner. The use of model-based ToC enabled the narrowing of the design space and monitoring of the design parameters and performance metrics and enabled SBCE adoption in the design process. The main contributions of this research are presenting the state-of-the-art in ToC generation and application, proposing the model, and demonstrating SBCE in highly innovative projects, while its importance lies in the opportunity to further disseminate SBCE to different development environments. © The Author(s) 2023.
引用
下载
收藏
页码:89 / 100
页数:11
相关论文
共 50 条
  • [31] Model-based Approaches to Managing Concurrent Engineering
    Eppinger, Steven D.
    JOURNAL OF ENGINEERING DESIGN, 1991, 2 (04) : 283 - 290
  • [32] Delimiting design: expanding the limits of concurrency through set-based concurrent engineering
    Rismiller, Sean
    Cagan, Jonathan
    McComb, Christopher
    JOURNAL OF ENGINEERING DESIGN, 2023, 34 (10) : 786 - 813
  • [33] THE DECISION PROCESS IN SET-BASED CONCURRENT ENGINEERING- AN INDUSTRIAL CASE STUDY
    Raudberget, D.
    11TH INTERNATIONAL DESIGN CONFERENCE (DESIGN 2010), VOL 1-3, 2010, : 937 - 946
  • [34] Managing concurrent construction projects using knowledge management and set-based thinking.
    Belay, Alemu Moges
    Torp, Olav
    Thodesen, Carl
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 235 - 242
  • [35] Mechatronic System Design with Manufacturing Constraints using Set-Based Concurrent Engineering
    Ammar, Randa
    Hammadi, Moncef
    Choley, Jean-Yves
    Barkallah, Maher
    Louati, Jamel
    12TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON2018), 2018, : 726 - 732
  • [36] Understanding collaboration in sub-structured teams through a computational model of set-based concurrent engineering
    Rismiller, Sean
    Cagan, Jonathan
    Mccomb, Christopher
    JOURNAL OF ENGINEERING DESIGN, 2024, 35 (05) : 543 - 569
  • [37] An internet graph model based on trade-off optimization
    J. I. Alvarez-Hamelin
    N. Schabanel
    The European Physical Journal B, 2004, 38 : 231 - 237
  • [38] An internet graph model based on trade-off optimization
    Alvarez-Hamelin, JI
    Schabanel, N
    EUROPEAN PHYSICAL JOURNAL B, 2004, 38 (02): : 231 - 237
  • [39] Fuzzy Set-Based Risk Evaluation Model for Real Estate Projects
    孙艺键
    黄如福
    陈岱林
    李宏男
    Tsinghua Science and Technology, 2008, (S1) : 158 - 164
  • [40] Fuzzy Set-Based Risk Evaluation Model for Real Estate Projects
    School of Civil and Hydraulic Engineering, Dalian University of Technology, Dalian, 116024, China
    不详
    Tsinghua Sci. Tech., 2008, SUPPL. 1 (158-164): : 158 - 164