Mechanism of disaster induced by dynamic instability of coal pillar group in room-and-pillar mining of shallow and close coal seams

被引:0
|
作者
Zhu W. [1 ,2 ]
Xu J. [2 ]
Chen L. [3 ]
Li Z. [1 ]
Liu W. [4 ]
机构
[1] School of Mines, China University of Mining and Technology, Xuzhou
[2] Stafe Key Laboratory of Coal Resource and Safe Mining, China University of Mining and Technology, Xuzhou
[3] School of Resources and Safety Engineering, Central South University, Changsha
[4] Xi'an Design Engineering Co., Ltd., China Coal Energy Group, Xi'an
来源
关键词
Close coal seams; Instability of coal pillar; Mine earthquake; Room mining; Shallow cover; Support failure;
D O I
10.13225/j.cnki.jccs.2018.0907
中图分类号
学科分类号
摘要
In the western part of China, mine disasters such as support failure, surface stepped subsidence and mine earthquake, are prone to occur when lower coal seam is extracted which is closely beneath the coal pillars left after room-and-pillar mining with shallow overburden. In this paper, physical modelling and numerical simulation method were adopted to investigate the dynamic instability process of upper coal pillar group and the mechanism of support failure under the influence of lower coal seam mining. According to the measured statistics in some mines after coal mining of Yuyang District, only when the proportion of elastic core area of the coal pillars is greater than 31% can the room coal pillars keep long-term stability. The simulation result after mining lower coal seams shows that the failure form and instability sequence of the upper coal pillars have close relations with the positions relative to the lower coal seam working face. The damage and instability of room coal pillar occur in the positions of open-off cut, working face, and the middle of goaf successively. Furthermore, the coal pillars in the open-off cut and working face mostly show horizontal shear failure, while the coal pillars in the middle of the goaf show vertical fracturing damage. According to the numerical simulation results of Shigetai Coal Mine, the peak abutment pressure of coal pillar in upper 2-2 coal seam increases from in-situ stress 2.8 MPa to 12 MPa after coal mining with the stress concentration factor at 4.28. After the lower 3-1 coal seam working face mined, the peak abutment pressure of the retained pillar in upper 2-2 coal seam continually increases to 30 MPa with the stress concentration factor up to 10.71. The open-off cut side of the lower coal seam working face showed uneven horizontally bearing with the coal pillar directly above the lower coal seam working face and the influence of horizontal tensile deformation are the main reasons for the diagonal failure mode of the boundary coal pillars. After the instability of two sides coal pillars, the roof instantaneously occur overall shear breakage, causing mine earthquake, and multi-layered strata in the roof settled suddenly in the form of "rigid body motion" and hit against the floor, leading to the collapse of the room coal pillars in the middle of goaf. At the same time, the huge impact force further leads to the full cutting of the strata between the upper and lower coal seams, which results in the roof cutting and support failure in the lower coal seam working face. It was found in the experiment that there was only about 0. 45 seconds from the failure of the first coal pillar in the overlying coal pillar group to the overall unstable movement and the final stability, among them, the full cutting of the strata between the upper and lower coal seams only took about 0.05 seconds. © 2019, Editorial Office of Journal of China Coal Society. All right reserved.
引用
收藏
页码:358 / 366
页数:8
相关论文
共 20 条
  • [11] Yang J., Dynamic pressure prevention and control technology of coal mining face with shallow depth and contiguous seams passing through overburden goaf and coal pillars, Coal Science and Technology, 43, 6, pp. 9-13, (2015)
  • [12] Li H., Yang H., Zhang B., Et al., Control study of strong strata behaviors during the fully mechanized working face out of concentrated coal pillar in a shallow depth seam in proximity beneath a room mining goaf, Journal of China Coal Society, 40, pp. 6-11, (2015)
  • [13] Xiao J., Li S., Zhang B., Et al., Control technology of dynamic mine strate pressure of fully-mechanized coal mining face under gob left by room and pillar mining of shallow depth seam, Coal Science and Technology, 42, 10, pp. 20-23, (2014)
  • [14] Zhu W., Xu J., Xu G., Mechanism and control of roof fall and support failure incidents occurring near longwall recovery roadways, Journal of the Southern African Institute of Mining and Metallurgy, 117, pp. 1063-1072, (2017)
  • [15] Meng D., Wang J., Wang J., Mechanism on the failure and caving of roof strata in pillar and house mining, Journal of China Coal Society, 32, 6, pp. 577-580, (2007)
  • [16] Tu S., Dou F., Wan Z., Et al., Strata control technology of the fully mechanized face in shallow coal seam close to the above room-and-pillar gob, Journal of China Coal Society, 36, 3, pp. 366-370, (2011)
  • [17] Xie X., Study on the characteristics of strata behavior in shallow seam longwall mining under the room-and-pillar mining goaf, Journal of China Coal Society, 37, 6, pp. 898-902, (2012)
  • [18] Wei L., Zhang B., Fu X., Et al., Support resistance analysis for special roof structures under room mining goaf, Chinese Journal of Rock Mechanics and Engineering, 34, 10, pp. 2142-2147, (2015)
  • [19] Wei L., Qi Q., Li H., Et al., A case study of damage energy analysis and an early warning by microseismic monitoring for large area roof caving in shallow depth seams, Shock and Vibration, 2015, pp. 1-9, (2015)
  • [20] Xu J., Zhu W., Ju J., Mechanism of dynamic mine pressure occurring below adjacent upper chamber mining goaf with shallow cover depth, Journal of China Coal Society, 42, 2, pp. 500-509, (2017)