Optimized process intensification through dynamic performance simulation and evaluation of treatment alternatives for a wastewater treatment plant in Toronto

被引:1
|
作者
Ezzahraoui, Fatima-zahra [1 ]
Hamza, Rania [1 ]
机构
[1] Toronto Metropolitan Univ, Dept Civil Engn, 350 Victoria St, Toronto, ON M5B 2K3, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Activated sludge BioWin model; Wastewater characterisation; Sampling campaign; Membrane aerated biofilm reactor; Ludzack-Ettinger; Sludge co-thickening;
D O I
10.1016/j.rineng.2024.102047
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, a comprehensive plant-wide model of the North Toronto Treatment Plant (NTTP) was developed, focusing on improving operational efficiency and capacity utilization. NTTP, with a rated capacity of 45 MLD, is currently operating at about 18 MLD with treatment processes including physical units (incorporating four primary settling tanks), chemical precipitation (for phosphorus removal using ferrous chloride), and biological processes (utilizing eight plug-flow conventional activated sludge (CAS) aeration tanks), and two sets of final clarifiers. Utilizing Biowin 6.2, the study constructed and calibrated a mechanistic model based on historical plant records and extensive sampling campaign data gathered from July to August 2022. The performance of various process configurations under different operational and seasonal conditions was evaluated. It was observed that the Ludzack-Ettinger (L-E) configuration demonstrated enhanced performance in terms of Environmental Compliance Approval (ECA) objectives and cost-efficiency compared to the CAS process. However, the L-E configuration posed challenges related to the final clarifier loading. The State Point Analysis (SPA) conducted within the study emphasized the effectiveness of the Membrane Aerated Bioreactor (MABR) in producing highquality effluent, while also reducing the burden on the final clarifiers. This research provides a foundation for potential upgrades to NTTP, leveraging existing infrastructure to approach its full rated capacity while maintaining adherence to current ECA objectives.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Intensification of the Biomethanisation Process in Wastewater Treatment Plant
    Drzewicki, A.
    Bulkowska, K.
    Tomczykowska, M.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH, 2015, 9 (03) : 805 - 812
  • [2] Performance intensification of Prague wastewater treatment plant
    Novák, L
    Havrlíková, D
    [J]. WATER SCIENCE AND TECHNOLOGY, 2004, 50 (07) : 139 - 146
  • [3] Performance Evaluation of Wastewater Treatment Plant
    Prashant P. Bhave
    Shirish Naik
    Shubham D. Salunkhe
    [J]. Water Conservation Science and Engineering, 2020, 5 : 23 - 29
  • [4] Performance Evaluation of Wastewater Treatment Plant
    Bhave, Prashant P.
    Naik, Shirish
    Salunkhe, Shubham D.
    [J]. WATER CONSERVATION SCIENCE AND ENGINEERING, 2020, 5 (1-2) : 23 - 29
  • [5] Intensification of the Wastewater Treatment Process of a Bitumen Plant with the Production of Recycled Water
    Serikbayeva, Akmaral
    Taizhanova, Lyailim
    Suleimenova, Botagoz
    Altybayeva, Zhansaule
    Seidalieva, Leila
    [J]. JOURNAL OF ECOLOGICAL ENGINEERING, 2023, 24 (02): : 295 - 301
  • [6] Operation Performance Evaluation of Municipal Wastewater Treatment Plant by Analytic Hierarchy Process
    Zhang, Xiaoxin
    Huang, Jin
    Lin, Ling
    Wang, Yueping
    Zhang, Xinheng
    [J]. 5TH ANNUAL INTERNATIONAL CONFERENCE ON MATERIAL ENGINEERING AND APPLICATION (ICMEA 2018), 2019, 484
  • [7] Multiple-objective evaluation of wastewater treatment plant control alternatives
    Flores-Alsina, Xavier
    Gallego, Alejandro
    Feijoo, Gumersindo
    Rodriguez-Roda, Ignasi
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2010, 91 (05) : 1193 - 1201
  • [8] Dynamic simulation for upgrading of wastewater treatment plants - An assessment of treatment plant performance with regard to the EC-directive concerning urban wastewater treatment
    Sintic, A
    Rolfs, T
    Freund, M
    Dorgeloh, E
    [J]. WATER SCIENCE AND TECHNOLOGY, 1998, 37 (09) : 73 - 79
  • [9] Process Intensification in Water and Wastewater Treatment Systems
    Tayalia, Yatin
    Vijaysai, P.
    [J]. 11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 32 - 40
  • [10] DYNAMIC EFFECTS OF WET WEATHER ON BIOLOGICAL TREATMENT PROCESS IN WASTEWATER TREATMENT PLANT
    Gu, Xiaodan
    Zhang, Zhi
    Huang, Yong
    Ding, Yongwei
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2017, 26 (11): : 6603 - 6615