Data exploration on factors that influences construction cost and time performance on construction project sites

被引:26
|
作者
Amusan, Lekan M. [1 ]
Afolabi, Adedeji [1 ]
Ojelabi, Raphael [1 ]
Omuh, Ignatius [1 ]
Okagbue, Hilary, I [2 ]
机构
[1] Covenant Univ, Dept Bldg Technol, Ota, Nigeria
[2] Covenant Univ, Dept Math, Ota, Nigeria
来源
DATA IN BRIEF | 2018年 / 17卷
关键词
Likert scale; Questionnaire; Construction; Cost overrun; Severity index; Survey; Statistics;
D O I
10.1016/j.dib.2018.02.035
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project. (C) 2018 The Authors. Published by Elsevier Inc.
引用
收藏
页码:1320 / 1325
页数:6
相关论文
共 50 条
  • [1] Construction Project Cost Escalation Factors
    Shane, Jennifer S.
    Molenaar, Keith R.
    Anderson, Stuart
    Schexnayder, Cliff
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (04) : 221 - 229
  • [2] Research on the total cost factors of construction project
    Zhu Xianghua
    Liu Yisheng
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 262 - 266
  • [3] Assessing Construction Constraint Factors on Project Performance in the Construction Industry
    Masoetsa, Tshweu Given
    Ogunbayo, Babatunde Fatai
    Aigbavboa, Clinton Ohis
    Awuzie, Bankole Osita
    BUILDINGS, 2022, 12 (08)
  • [4] Factors contributing to project time and hence cost overrun in the Malaysian construction industry
    Shehu, Zayyana
    Endut, Intan
    Akintoye, Akintola
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) : 55 - +
  • [5] Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Abdullah, Mohd Razaki
    Azis, Ade Asmi Abdu
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2010, 1 (02): : 41 - 54
  • [6] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860
  • [7] Factors influencing municipal construction project performance
    Alsulamy, Saleh
    Gupta, Naren
    Sloan, Brian
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2014, 167 (02) : 108 - 117
  • [8] A study and identification of the time and cost overrun in the construction project
    Chandragiri, Anand babu
    Jeelani, Syed Hamim
    Akthar, Salim
    Lingeshwaran, N.
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5426 - 5431
  • [9] Cost overrun and time delay of construction project in Indonesia
    Susanti, Riza
    8TH ENGINEERING INTERNATIONAL CONFERENCE 2019, 2020, 1444
  • [10] Factors affecting the safety performance of contractors and construction sites
    Wong, KW
    Chan, PC
    Lo, KK
    IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1999, : 19 - 24