REDUCING METAL CONSUMPTION AND IMPROVING TUBE QUALITY ON THE 140 TUBE-PRODUCTION UNIT AT THE SINARSKII PIPE PLANT

被引:0
|
作者
BISK, MB
DERVOED, EA
BORODIN, AI
机构
关键词
D O I
10.1007/BF00741909
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
引用
收藏
页码:437 / 442
页数:6
相关论文
共 37 条
  • [21] Mini tube-production unit 40–80 with a three-high reeling mill
    B. A. Romantsev
    A. S. Aleshchenko
    A. V. Goncharuk
    S. P. Galkin
    Metallurgist, 2012, 55 : 918 - 924
  • [22] 3-HIGH PIERCING MILL IN A REBUILT TPA-550 TUBE-PRODUCTION UNIT
    GETIYA, IG
    OSADCHII, VY
    GOLODYAGIN, AS
    SHUMILIN, VK
    SAFYANOV, AV
    MOGILEVKIN, FD
    LAPIN, LI
    POPOV, AS
    SHPYREV, AP
    FROLOCHKIN, VV
    METALLURGIST, 1983, 27 (3-4) : 101 - 104
  • [23] MINI TUBE-PRODUCTION UNIT 40-80 WITH A THREE-HIGH REELING MILL
    Romantsev, B. A.
    Aleshchenko, A. S.
    Goncharuk, A. V.
    Galkin, S. P.
    METALLURGIST, 2012, 55 (11-12) : 918 - 924
  • [24] USING HARD-FACED STEEL ROLLS AND ELECTROSPARK ALLOYING OF THE WORKING SURFACE ON THE LONGITUDINAL ROLLING-MILLS OF THE 140 TUBE-PRODUCTION UNIT
    SHIFRIN, IZ
    ONISHCHENKO, MP
    PASTERNAK, NM
    BONDARCHUK, NA
    UMERENKOV, VN
    IVCHENKOV, SI
    KARMAZIN, VY
    UGRYUMOV, YD
    VOLPOV, ML
    METALLURGIST, 1981, 25 (11-1) : 479 - 481
  • [25] SCIENTIFICALLY SUBSTANTIATED NORMALIZING OF METAL CONSUMPTION IN TUBE PRODUCTION
    KHAUSTOV, GI
    BOGATYREV, VA
    MIKHAILOVSKAYA, II
    SAVCHENKO, AS
    KALASHNIKOV, YL
    METALLURGIST, 1979, 23 (11-1) : 865 - 866
  • [26] MASTERING THE PRODUCTION OF 159-MM-DIAMETER TUBING ON THE 140 TUBE PRODUCTION UNIT
    GREKHOV, IA
    BISK, MB
    KIRICHENKO, AN
    MITROPOLOSKII, YG
    DERVOED, EA
    METALLURGIST, 1980, 24 (1-2) : 27 - 30
  • [27] Reducing Metal Consumption During Pipe Production on Electric-Welded Pipe Mills
    Totskii, I. T.
    Anan'ev, A. S.
    Markin, O. L.
    Shchennikov, A. N.
    Tolmacheva, T. V.
    METALLURGIST, 2014, 58 (7-8) : 600 - 602
  • [28] Reducing Metal Consumption During Pipe Production on Electric-Welded Pipe Mills
    I. T. Totskii
    A. S. Anan’ev
    O. L. Markin
    A. N. Shchennikov
    T. V. Tolmacheva
    Metallurgist, 2014, 58 : 600 - 602
  • [29] AUTOMATIC UNIT FOR ULTRASONIC CONTROL OF TUBE QUALITY IN THE PRODUCTION LINE
    MARCHENKO, VI
    USTINOV, BS
    METALLURGIST, 1980, 24 (7-8) : 260 - 262
  • [30] TUBE-SHAPING UNIT - A WAY OF IMPROVING THE QUALITY OF SHAPED TUBES
    OZOL, VL
    KANDYBA, LF
    BYCHENKOV, NT
    ZBARSKII, LA
    KOROPOV, BE
    METALLURGIST, 1989, 33 (7-8) : 156 - 156