共 50 条
- [11] DUCT DILATION EXPERIMENTS IN EBR-II TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 30 (NOV): : 192 - 193
- [12] INCREASING CENTRAL POWER IN EBR-II TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 180 - 181
- [13] EBR-II - SEARCH FOR THE LOST SUBASSEMBLY TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 45 : 563 - 564
- [14] EXPERIENCE WITH EBR-II FUEL HANDLING TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 774 - 774
- [15] INSTRUMENTED SUBASSEMBLY SYSTEM IN EBR-II TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1970, 13 (01): : 355 - &
- [17] Operational reliability testing at EBR-II Nuclear Engineering International, 1981, 26 (318): : 42 - 44
- [18] EXPERIENCE WITH BREACHED ELEMENTS AT EBR-II TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 27 (NOV): : 820 - 822
- [20] CALCULATIONAL ANALYSIS OF EBR-II GRID PLATE DOSIMETRY TESTS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1974, 18 (JUN23): : 373 - 374