共 50 条
- [1] UPDATE OF CPM-PERT GLOSSARY OF TERMS [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (01): : 35 - 41
- [2] CPM-PERT SCHEDULING FOR A LARGE INDUSTRIAL PROJECT [J]. OPERATIONS RESEARCH, 1965, S 13 : B161 - &
- [3] COMPARING COMMERCIALLY AVAILABLE CPM-PERT COMPUTER-PROGRAMS [J]. INDUSTRIAL ENGINEERING, 1978, 10 (04): : 37 - 38
- [4] Simplified CPM/PERT simulation model - Discussion [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06): : 513 - 514
- [6] MODELING HYDRAULIC PHENOMENA - A GLOSSARY OF TERMS - DISCUSSION [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1983, 109 (06): : 937 - 938
- [8] PERT, CPM AND EXPORT PROCESS [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1974, 2 (03): : 421 - 426
- [10] DEVELOPMENTS IN CPM, PERT, AND NETWORK ANALYSIS [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (04): : 769 - 784