共 50 条
- [1] UPDATE OF CPM-PERT GLOSSARY OF TERMS - DISCUSSION [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (04): : 557 - 557
- [2] CPM-PERT SCHEDULING FOR A LARGE INDUSTRIAL PROJECT [J]. OPERATIONS RESEARCH, 1965, S 13 : B161 - &
- [3] COMPARING COMMERCIALLY AVAILABLE CPM-PERT COMPUTER-PROGRAMS [J]. INDUSTRIAL ENGINEERING, 1978, 10 (04): : 37 - 38
- [6] PERT, CPM AND EXPORT PROCESS [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1974, 2 (03): : 421 - 426
- [8] DEVELOPMENTS IN CPM, PERT, AND NETWORK ANALYSIS [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (04): : 769 - 784
- [10] Simplified CPM/PERT simulation model [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03): : 219 - 226