共 50 条
- [1] RESOLVING CONTRACT DISPUTES + CONSTRUCTION DOCUMENTS [J]. PROGRESSIVE ARCHITECTURE, 1983, 64 (11): : 136 - 136
- [3] RESOLVING GOVERNMENT CONTRACT DISPUTES - WHY NOT ARBITRATE [J]. FEDERAL BAR JOURNAL, 1975, 34 (01): : 1 - 20
- [4] RESOLVING CONSTRUCTION CONTRACT DISPUTES THROUGH ARBITRATION [J]. ARBITRATION JOURNAL, 1968, 23 (03): : 141 - 161
- [5] RESOLVING DISPUTES OVER CONTRACT NOTICE REQUIREMENTS [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 738 - 755
- [6] RESOLVING CONTRACT DISPUTES BASED ON DIFFERING SITE-CONDITION CLAUSE [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (04): : 767 - 790
- [7] Alternative ways of resolving disputes in the field of contract law [J]. AMAZONIA INVESTIGA, 2024, 13 (76): : 258 - 273
- [8] ARBITRATION - IS IT AN ACCEPTABLE METHOD OF RESOLVING CONSTRUCTION CONTRACT DISPUTES [J]. FORUM-AMERICAN BAR ASSOCIATION, 1980, 16 (02): : 281 - 304
- [9] Developing a document management model for resolving contract disputes for contractor [J]. CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 723 - 728
- [10] Solving contract disputes based on the FIDIC contract [J]. Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 460 - 463