共 50 条
- [22] Discrete-Time GeoX/G/1 Queue with Geometrically Working Vacations and Vacation Interruption QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 10 (04): : 423 - 442
- [26] The GI/Geo/1 queue with start-up period and single working vacation and bernoulli vacation interruption Li, T. (liltaot1984@163.com), 1600, Binary Information Press, Flat F 8th Floor, Block 3, Tanner Garden, 18 Tanner Road, Hong Kong (09):
- [27] An M/M/1 retrial queue with Bernoulli-Schedule-Controlled vacation and vacation interruption ICIC Express Lett., 12 (3385-3392):