FOLLOW-UP OF PRODUCTIVITY ON WORK: TECHNIQUES OF MEASUREMENT OF PERFORMANCE OF WORK

被引:0
|
作者
Aguilar, Guillermo Mejia [1 ]
Hernandez C., Triny Carolina [1 ]
机构
[1] Univ Ind Santander, Escuela Ingn Civil, Bucaramanga, Colombia
来源
UIS INGENIERIAS | 2007年 / 6卷 / 02期
关键词
Productivity; Workmanship Productivity; Construction Workmanship Analysis; In-Situ Controlling Techniques; Assessment of Workmanship Productivity;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Management systems often present flaw, since those systems don't adopt control indexes like productivity, which prevents form identifying and defining (from both the systematic and systemic point of view) the problems that require taking corrective and mitigating actions [1]. Methodologies such as "Lean Construction" are based on the management of processes, as a way to maximize revenues and minimize costs, here the improvement of productivity becomes an important parameter for the management system; focusing on the verification of both the process and the product, leaving behind the typical tendency of verifying only results, that is the tendency for control techniques [2]. This study pretends to identify the controlling techniques that should be used when referring to productivity as the quality management control index.
引用
收藏
页码:45 / 59
页数:15
相关论文
共 50 条