共 50 条
- [21] THE EFFECT OF GEOLOGICAL MODELING ON ORE ESTIMATION AT KIDD-CREEK 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 587 - 596
- [22] SO2 EMISSION CONTROL FROM THE KIDD CREEK COPPER SMELTER CIM BULLETIN, 1989, 82 (932): : 93 - 100
- [23] MODIFICATIONS TO THE PROCESS GAS HANDLING-SYSTEM AT KIDD CREEK COPPER SMELTER CIM BULLETIN, 1994, 87 (977): : 77 - 85
- [25] THE KIDD COPPER SMELTER AND REFINERY - DESCRIPTION AND EARLY OPERATION CIM BULLETIN, 1984, 77 (865): : 84 - 94
- [27] ISOTOPE MAPPING AROUND THE KIDD-CREEK DEPOSIT, ONTARIO - APPLICATION TO EXPLORATION AND COMPARISON WITH OTHER GEOCHEMICAL INDICATORS EXPLORATION AND MINING GEOLOGY, 1995, 4 (03): : 175 - 185
- [28] Xstrata copper launches Kidd Creek expansion project E&MJ-ENGINEERING AND MINING JOURNAL, 2008, 209 (07): : 50 - +
- [29] EXPANSION OF THE KIDD CREEK MINES ELECTROLYTIC ZINC PLANT CIM BULLETIN, 1987, 80 (899): : 60 - 60
- [30] Converting furnace upgrades at the Kidd Metallurgical Division copper smelter SULFIDE SMELTING '98: CURRENT AND FUTURE PRACTICES, 1998, : 387 - 397