MANAGING REFORMS ON A LARGE-SCALE - WHAT ROLE FOR OR/MS

被引:0
|
作者
PAPOULIAS, DB [1 ]
TSOUKAS, H [1 ]
机构
[1] UNIV WARWICK,COVENTRY CV4 7AL,W MIDLANDS,ENGLAND
关键词
DEVELOPING AND DEVELOPED COUNTRIES; OR/MS; MANAGEMENT; POLITICS; REFORMS;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper evidence is presented regarding the degree to which social reforms have been systematically managed by the Public Sector in Greece between 1975-1992. The findings reported here concur with the findings of others that, by and large, in developing countries, important social reforms tend not to be systematically handled. A twofold explanation is advanced for what seems to be an inverse relationship between the importance of social reforms and the use of OR/MS techniques for their management. First, the subsidiary role of OR/MS techniques in both developing and developed countries is partly due to the conflict-ridden and complex nature of important social reforms, which are not as amenable to systematic analysis as small-scale reforms. It is also partly due to the competitive nature of liberal democracies which compels governments to use social policies not only in a problem-solving mode but also in a tactical mode. Secondly, the low degrees of bureaucratization and rationalization that characterize developing countries, in particular, account for seeing social reforms not so much as manifestations of rational calculation designed to solve problems but as political tools in the service of their masters. It is concluded that OR/MS may be useful in developing countries not so much for its techniques as for its ideology; not for what it is but for what it stands for.
引用
收藏
页码:977 / 986
页数:10
相关论文
共 50 条
  • [41] Addressing the challenge of managing large-scale digital multimedia libraries
    Gurrin, Cathal
    Aarflot, Tjalve
    Sav, Sorin
    Johansen, Dag
    Journal of Digital Information Management, 2009, 7 (05): : 261 - 269
  • [42] Service middleware for self-managing large-scale systems
    Laboratory for Communication Networks, KTH Royal Institute of Technology, Stockholm, Sweden
    IEEE Trans. Netw. Serv. Manage., 2007, 3 (50-64):
  • [43] Interview with Reinhard Schutte on "Managing Large-Scale BPM Projects"
    Becker, Joerg
    Schuette, Reinhard
    BUSINESS & INFORMATION SYSTEMS ENGINEERING, 2014, 6 (04): : 243 - 245
  • [44] Managing Speed in Companies Developing Large-Scale Embedded Systems
    Martini, Antonio
    SOFTWARE BUSINESS: FROM PHYSICAL PRODUCTS TO SOFTWARE SERVICES AND SOLUTIONS, 2013, 150 : 231 - 232
  • [45] Large-scale protein analysis by 2DLC-MS/MS system
    Kaji, H
    Isobe, T
    PLANT AND CELL PHYSIOLOGY, 2003, 44 : S17 - S17
  • [46] Systematic troubleshooting for LC/MS/MS - Part 2: Large-scale LC/MS/MS and automation
    Weng, ND
    Halls, TDJ
    BIOPHARM-THE APPLIED TECHNOLOGIES OF BIOPHARMACEUTICAL DEVELOPMENT, 2002, 15 (01): : 22 - +
  • [47] Studying large-scale reforms of instructional practice: An example from mathematics and science
    Hamilton, LS
    McCaffrey, DF
    Stecher, BM
    Klein, SP
    Robyn, A
    Bugliari, D
    EDUCATIONAL EVALUATION AND POLICY ANALYSIS, 2003, 25 (01) : 1 - 29
  • [48] On Victorious Renaissance of Large-scale Market Mythology in Russia in the Period of Transformation Reforms
    Livchits, V. N.
    Tischenko, T., I
    Frolova, M. P.
    Livchits, S., V
    2017 TENTH INTERNATIONAL CONFERENCE MANAGEMENT OF LARGE-SCALE SYSTEM DEVELOPMENT (MLSD), 2017,
  • [49] What impacts the performance of large-scale government projects?
    Patanakul, Peerasit
    Kwak, Young Hoon
    Zwikael, Ofer
    Liu, Min
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (03) : 452 - 466
  • [50] Large-scale assessments that support learning: What will it take?
    Chudowsky, N
    Pellegrino, JW
    THEORY INTO PRACTICE, 2003, 42 (01) : 75 - 83